Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
RN
Chapter 6
263
Johnson, "Archangel log," 17-24
CO5653421 UNCLASSIFIED
Lockheed design for a hydrogen-powered aircraft (the CL-400). The
committee examined two other Kelly Johnson designs at this
meeting—a tailless subsonic aircraft with a very-low-radar cross sec-
tion (the G2A) and a new supersonic design (the A-2)—and did not
accept either one, the former because of its slow speed and the latter
because of its dependence on exotic fuels for its ramjets and its over-
all high cost. The committee approved the continuation of Convair's
work on a ramjet-powered Mach 4.0 "parasite" aircraft that would be
launched from a specially configured version of the B-58B bomber.
The design was termed a parasite because it could not take off on its
own but needed a larger aircraft to carry it aloft and accelerate it to
the speed required to start the ramjet engine. The Convair design was
called the FISH.'
Two months later, after reviewing the Convair proposal and yet
another Lockheed design for a high-speed reconnaissance aircraft (the
A-3), the Land committee concluded in late November 1958 that it
would indeed be feasible to build an aircraft whose speed and altitude
would make radar tracking difficult or impossible. The committee,
therefore, recommended that DCI Dulles ask President Eisenhower to
approve further pursuit of the project and to provide funds for addi-
tional studies and tests.6
On 17 December 1958, Allen Dulles and Richard Bissell briefed
the President on the progress toward a successor to the U-2. Also
present were Land and Purcell from the advisory committee,
Presidential Science Adviser James Killian, and Air Force Secretary
Donald Quarles. DCI Dulles reviewed the results of the U-2 missions
to date and stated his belief that a successor to the U-2 could be used
all over the world and "would have a much greater invulnerability to
detection."
Bissell then described the two competing projects by Lockheed
and Convair, noting that the chief question at the moment was
whether to use air launch or ground takeoff. The next phase, he add-
ed, would be detailed engineering, at the end of which it was pro-
posed that 12 aircraft be ordered at a cost of about $100 million. (01295111.6(dlill>111<25Yrs
(Si
OSA History, chap. 20, p. 8 (TS Codeword);
September 1958.
"OSA Chronology. p. 21 (TS Codeword)
History, chap. 20, p. 8 (TS Cocleword); Jo
"OXCART Story," p. 3 (S); OSA
hangel log," 12 November 1958.
""SecztL
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.