This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 24 …Instead of a conventional landing gear, Johnson proposed using two skis and a reinforced belly rib…
  • p. 25 …a perceived shortcoming of the Lockheed design."' Another factor in the rejection of Kelly Johnson's…
  • p. 26 …interview by Donald E. Welzenbach, Corona del Mar. California. 20 May 1985 (S). Johnson, "Log for…
  • p. 27 …Gardner described Kelly Johnson's proposal and showed the drawings to Strong. After this meeting. Strong…
  • p. 30 …To make Kelly Johnson's revolutionary design a reality, one additional source of support was necessary…
  • p. 42 …When James Killian asked Land to head Project Three, Land had to make a major decision…
  • p. 48 …do the job in Johnson's airplane. And further, 1 overlaid a curve showing that with…
  • p. 57 …demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed…
  • p. 58 …a week after he had been authorized to begin the project, Kelly Johnson wrote a 23…
  • p. 69 …project staff) flew LIZ with Kelly Johnson in a small Beechcraft plane piloted by eed's…
  • p. 72 …This responsibility has placed a heavy burden on the Office of Security for establishing procedures to…
  • p. 79 …Batlin suggested the method used by Nazi war criminal Hermann Goering, a thin glass ampule containing…
  • p. 81 …Kelly Johnson used a "wet-wing" design for the U-2, which meant that fuel was…
  • p. 89 …Airspeed was such a critical factor that Kelly Johnson added a vernier adjustment to the throttle…
  • p. 162 …By late 1957, Johnson agreed that something had to be done. After a series of tests…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 324 …OXCART did win a temporary reprieve in late November 1967. The Johnson administration decided to keep…
RN
Chapter 6
263
Johnson, "Archangel log," 17-24
CO5653421 UNCLASSIFIED
Lockheed design for a hydrogen-powered aircraft (the CL-400). The
committee examined two other Kelly Johnson designs at this
meeting—a tailless subsonic aircraft with a very-low-radar cross sec-
tion (the G2A) and a new supersonic design (the A-2)—and did not
accept either one, the former because of its slow speed and the latter
because of its dependence on exotic fuels for its ramjets and its over-
all high cost. The committee approved the continuation of Convair's
work on a ramjet-powered Mach 4.0 "parasite" aircraft that would be
launched from a specially configured version of the B-58B bomber.
The design was termed a parasite because it could not take off on its
own but needed a larger aircraft to carry it aloft and accelerate it to
the speed required to start the ramjet engine. The Convair design was
called the FISH.'
Two months later, after reviewing the Convair proposal and yet
another Lockheed design for a high-speed reconnaissance aircraft (the
A-3), the Land committee concluded in late November 1958 that it
would indeed be feasible to build an aircraft whose speed and altitude
would make radar tracking difficult or impossible. The committee,
therefore, recommended that DCI Dulles ask President Eisenhower to
approve further pursuit of the project and to provide funds for addi-
tional studies and tests.6
On 17 December 1958, Allen Dulles and Richard Bissell briefed
the President on the progress toward a successor to the U-2. Also
present were Land and Purcell from the advisory committee,
Presidential Science Adviser James Killian, and Air Force Secretary
Donald Quarles. DCI Dulles reviewed the results of the U-2 missions
to date and stated his belief that a successor to the U-2 could be used
all over the world and "would have a much greater invulnerability to
detection."
Bissell then described the two competing projects by Lockheed
and Convair, noting that the chief question at the moment was
whether to use air launch or ground takeoff. The next phase, he add-
ed, would be detailed engineering, at the end of which it was pro-
posed that 12 aircraft be ordered at a cost of about $100 million. (01295111.6(dlill>111<25Yrs
(Si
OSA History, chap. 20, p. 8 (TS Codeword);
September 1958.
"OSA Chronology. p. 21 (TS Codeword)
History, chap. 20, p. 8 (TS Cocleword); Jo
"OXCART Story," p. 3 (S); OSA
hangel log," 12 November 1958.
""SecztL