This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 11 …At great risk, US Air Force and Navy aircraft had been conducting peripheral reconnaissance and shallow…
  • p. 16 …As a result, in the late 1940s, the US Air Force and Navy began trying to…
  • p. 17 …Two months later, on 7 October 1952, Soviet fighter aircraft stalked and shot down a US…
  • p. 72 …agreement with the Air Force and the Navy (which at that time was also interested in…
  • p. 147 …turned to the Navy, which granted permission for Detachment C to use the Naval Air Station…
  • p. 180 …The Army, Navy, and CIA, however, doubted that any had been deployed, because none could be…
  • p. 223 …by Air Force and Navy reconnais- sance aircraft. President Kennedy used NPIC photographs to illustrate his…
  • p. 273 …Charyk, and his Navy counterpart, Garrison Norton. Designers from several air- craft manufacturers also attended some…
  • p. 283 …This engine had originally been developed for the Navy's large, jet-powered flying boat, the…
  • p. 297 …The need for additional buildings on the base was met by the Navy. Three surplus Navy…
  • p. 298 …After hearing Bissell and Holcomb's suggestion that the J58 might be used in future Navy…
Sratrt.11/Qt2.1....31■1
Chapter 5
251
005653421 UNCLASSIFIED
There was never another Agency U-2 mission from an aircraft
carrier. Although the idea of using a floating airbase to avoid political
sensitivity proved feasible, the cost did not. Aircraft carriers are enor-
mously expensive to operate and require an entire flotilla of vessels to
protect and service them. The movement of large numbers of big
ships is difficult to conceal and cannot be hastily accomplished, while
the deployment of a solitary U-2 to a remote airfield can take place
overnight.
A New Version of the U-2
By the summer of 1966, the number of flyable Agency U-2s had
dwindled to six—two at
in California—wan three more in LOCKIICCU ullueigu-
ing re Agency had originally ordered 20 U-2s in 1954-55
(the Air Force had purchased another 31 of these planes), and Kelly
Johnson's crew at the Skunk Works had managed to assemble four
additional craft for the Agency from leftover spare parts and usable
sections of crashed aircraft. This brought the total number of U-2s ac-
quired by the Agency to 24, for an average cost o leach.
_ -
At this point, the DC1 and the Secretary of Defense on 1 August
1966 decided to place an order with Lockheed for ei g ht more aircraft
to be used in the Agency and Air Force U-2 programs—a completely
new version of the aircraft. Kelly Johnson had been working on ways
to improve the performance of the U-2 since early 1965 because he
was concerned that all the modifications and additions to the aircraft
over the years had made it so heavy that it had lost almost half of its
ran ge and several thousand feet in cruisin g. altitude.7 ' The new model,
known as the U-2R, had a lon ger fuselage and a wider wingspan than
the original U-2. The U-2R's wings were 103 feet long with 1,000
square feet of lifting surface, in contrast to the U-2C's 80-foot wings
with only 600 square feet. The longer fuselage of the U-2R made it
possible to provide two pressurized bays with an additional 2.2 cubic
meters of equipment space and also achieve a better weight distribu-
tion. The net result of all these improvements was a much better per-
forming aircraft. No lon g er did the U-2 pilot have to worry about
keeping the aircraft's speed at altitude within a 6-knot window in the
stall/buffet corner of the flight envelope. The envelope was now ex-
tended to 20 knots, which greatly improved flyability.
E0 12958 1.6fillill>1010<25Yrs
Johnson, "Log for Project X, - 2 February 1965. June to October 1965, 20 October
1965: Johnson. - U-2R Log, - January to August 1966.
ret
UNCLASSIFIED

Not linked to a story yet.

About this file