Documents / FOIA release

CIA/CSI/ History Staff Monograph, The Central Intelligence Agency and Overhead Reconnaissance: The U-2 and Oxcart Programs, 16 July 2002.

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, written in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and its two aircraft, the U-2 and the A-12 OXCART. It follows their development, the overflights of the Soviet Union, the downing of Francis Gary Powers in 1960, and later operations. One section is titled "U-2s, UFOs, and Operation BLUE BOOK."

  • p. 18 …Leghorn persuaded his superiors to submit his suggestion to the . Pentagon for funding. He had not…
  • p. 20 …Meanwhile Leghorn, frustrated by the rejection of his original concept, had transferred to the Pentagon in…
  • p. 22 …become the assistant director of Lockheed's Advanced Development Program, was in the Pentagon on business…
  • p. 24 …for the construction and maintenance of 30 aircraft to a group of senior Pentagon officials that…
  • p. 26 …He had been present at Kelly Johnson's presentation on the CL-282 at the Pentagon…
  • p. 27 …with Strong in the Pentagon on 12 May 1954. six days before the Wright Air Development…
  • p. 52 …Late on the morning of 2 December 1954, Dulles told Bissell to go to the Pentagon…
  • p. 91 …1-le then briefed a high-level Pentagon panel that included the Secretary of the Air…
  • p. 92 …After a half hour passed, the base commander called the Pentagon to ask where the crippled…
199
Aftermath of the Bay of Pigs
invasion, 20 April 1961
005653421 UNCLASSIFIED
Refueling a U-2 in flight was a very delicate task. When fully
loaded with fuel, KC-135 tankers found it difficult to reduce airspeed
to-200 knots, the safest speed for refueling a U-2. As for the U-2s,
they were in a very vulnerable position when approaching a tanker at
200 knots because their frail wings could not stand much stress. As a
result, U-2 pilots had to approach the KC-135 tankers very carefully
in order to avoid the vortexes from the wingtips of the tanker and the
turbulence caused by the four large jet engines. During the first few
years of refueling operations, two U-2s crashed after their wings
broke off as they crossed into the turbulent area behind the tankers;
one of the pilots was killed!'
The in-flight refueling capability was a useful modification to
the U-2, but it could not dramatically extend mission length. The
main limiting factor remained pilot fatigue, which prevented missions
from lasting longer than approximately 10 hours.
U-2 Coverage During the Cuban Missile Crisis
Cuba remained a high-priority target even after the Bay of Pigs inva-
sion failed in April 1961. Soon afterward, Detachment G U-2s began
flying monthly missions over Cuba in a program known as Project
" Ibud.. p. 11-12 (TS Codeword).
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.