Documents / FOIA release
This is an October 1968 contribution by the Central Intelligence Agency's Office of Strategic Research to National Intelligence Estimate 11-14-68 on Soviet and East European general purpose forces. It covers Warsaw Pact war plans for Central Europe, the effects of the Czechoslovak crisis, and the doubling of Soviet forces on the Chinese border since 1965. It also assesses ground, tactical air, naval and coastal defense forces. The text does not mention UFOs or unidentified aerial phenomena.
“Indian Air Force”2 pages
exist only on paper, or as portions of the civilian economy. Category II divisions can probably be mobilized and deployed in a matter of days. They cannot be sustained in combat more than a few days, however, without full logistical support by the Front rear services. We believe that the Warsaw Pact is capable of mobilizing the men and vehicles required to organize the five Fronts intended for Central Europe in a matter of days if the process is not interrupted-by hostile military action. However, their complete integration as functioning, combat- effective units, particularly at the Front level, is likely to require more time. In an emergency the mobilization of the Carpathian and Belorussian Fronts and their movement into Central Europe could probably be accomplished in two weeks or less, although some important elements of the Front rear services might still be incomplete at that time. In a situation where time was of their choosing, the Soviets would probably plan to take about three weeks to complete the reinforcement. The initial combat effectiveness of Category II divisions, and of armies made up mostly from such divisions, will certainly be much lower than that of the GSFG. However, these forces are probably not intended to meet fully combat-effective NATO divisions. Rather the Soviets would expect to commit them after their first-echelon Fronts had endeavored to reduce NATO's capabilities. 6. Equipment Modernization New evidence the Soviet inventory of armored personnel carriers probably includes about 14,000 vehicles of all models, about half of which are still obsolescent BTR-152's. This total is only a little more than half the estimated requirement for.APC's and is consistent with other evidence which indicates that only Category.I divisions are fully equipped with APC's and that some low-strength divisions have few or none. - 47 - TOF GRT
Not linked to a story yet.
FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 115 pages are in the text index: search them above, or from the library's search.