Documents / FOIA release

/specialCollection/DCI/Smith FOIA/1951/1951-July to September/1951-09-01.pdf

Central Intelligence Agency · 239 pages · text from the file's own layer

This Central Intelligence Agency file is a compilation of Top Secret Director's Log entries from September and December 1951. The entries are daily reports from CIA offices such as OSO, OPC and OO on covert operations and intelligence matters. They cover leaflet drops over mainland China, agent teams sent into Albania and Bulgaria, plans for defector detention centers in Panama, liaison with British, French and Spanish services, and the opening of the Trotsky papers at Harvard. None of the entries mentions UFOs.

  • p. 2 …Chief of Station, Madrid, feels that further discussion should await the arrival of the official CIA…
  • p. 72 …stay- behind operations in Spain informed O0SO/Madrid in strictest con- fidence that this program may…
  • p. 92 …Otto Skorzeny, former Nazi paramilitary hero, has reported in Madrid that Soviet authorities are receiving secret…
  • p. 107 …Tnis infonaation was brought to the attention of our representative in Madrid. ho requested that the…
  • p. 119 …On 26 October, Otto SKORZENY showed the Assistant Air Attache, Madrid, Spainy copies of reports allegedly…
  • p. 131 …He will arrive in Madrid approximately 18 November 1951. Colonel Thomas Betts, Senior CIA Representative in…
  • p. 168 …US Air Attache/Madrid has advised tht he is acting con- OSO will ask the Air…
  • p. 171 …official liaison with the Spanish Services in Madrid. A large US electronic instrument firm, which has…
  • p. 208 …Chief; British Secret Service/Madrid has indicated to the U.S. Legal Attache that the British…
  • p. 217 …OSO/Madrid, however, reports that the Chief of Spanish Intelligence wants the project to' continue on…
TOP SECRET
DIRECTOR'S LOG
ATE OF DATE 8:30 AM, 12 .Sept- 8:30 AM, 13 Sept. -
OCUMENT RECEIVED FROM TO SUBJECT ACTION
DD /P
A favorable reaction to the San Jose Civilian Bhbabilitation
Center has been reported by our station from the
cabinet of the Panamanian Govt. which considered the matter
on 11 Sept. The lease is now under donsideration by
Dr. Alfaro, legal advisor to the President:
A project covering construction, equipment, etc., required
to place this property in operation, estimated to run
about $1,200,000, bas been prepared and will be presented
to the PRO.
COPY# oF 5. SEP 12 195 1
TOP SECRET .

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 239 pages are in the text index: search them above, or from the library's search.