Documents / FOIA release

/specialCollection/DCI/Smith FOIA/1951/1951-July to September/1951-09-01.pdf

Central Intelligence Agency · 239 pages · text from the file's own layer

This Central Intelligence Agency file is a compilation of Top Secret Director's Log entries from September and December 1951. The entries are daily reports from CIA offices such as OSO, OPC and OO on covert operations and intelligence matters. They cover leaflet drops over mainland China, agent teams sent into Albania and Bulgaria, plans for defector detention centers in Panama, liaison with British, French and Spanish services, and the opening of the Trotsky papers at Harvard. None of the entries mentions UFOs.

  • p. 11 …on a mission to kidnap an individual cooperating with a CIA cover organization in -estern Germany…
  • p. 17 …OSO Djakarta believes he prefers to cooperate with the u.S. A Chinese claning to represent…
  • p. 34 …The American Red Cross has expressed appreciation for the "grand cooperation" of CIA personnel in the…
  • p. 44 …Bird is cooperating closely with CIA .there. Congressman Rogers and Killam's parents TOP. SECRET (CONTINUED…
  • p. 47 …The articles,,prepared by a CIA agent in cooperation with British intelligence, were planted through a…
  • p. 49 …Lie the expansion of cooperation between OSO and the Norwegian party's intelligence organization, which he…
  • p. 52 …the National Committee for a Free Albania cooperating with CIA in operations against Albania havemade politically…
  • p. 56 …A CIA agent in Germany has enlisted the cooperation of the East Zone Assistant Postmaster General…
  • p. 65 …The 2 Turkish officials expressed willingness to cooperate and have-agreed to the conduct of negotiations…
  • p. 80 …have 'attributed the agent's arrest to cooperation between U. S. intelligence and German- authorities. OPC…
  • p. 98 …Tudeh plans for Mehregan (the Autumn Festival). Cooperation with our agents led to the/arrest of…
  • p. 110 …Guaranty Trust is most cooperative, will divulge nothing further' and ddes not appear concerned by possible…
  • p. 115 …the Ozeek - Intelligence services with the secret cooperation of OSO. The traffic of this W/T…
  • p. 118 …willing'to cooperate in such a-project. This action is being taken in view of difficulties…
  • p. 134 …Although the owner of the Island was agreeable and cooperative there was parliamentary opposition and it…
  • p. 135 …to Economic Cooperation Administration. The President has now cancelled this NSC project in view of his…
  • p. 139 …the field to shown complete reluctance to 'cooperate with his superiors furnish details of and has…
  • p. 142 …been fully clarified, with close and infoiaed cooperation expected. in the future. Mutual benefit will .result…
  • p. 144 …Ladd was given a copy of CIA's message to the field on,,CIA/FBI cooperation…
  • p. 147 …that 'tripartite program of this kind in cooperation (between U. S., U. K.,-and Belgium) was…
  • p. 165 …to inforia of possible'need fir his cooperation in arranging aid to police and.security agencies…
  • p. 175 …Kingsbury Smith, European representative of 'the International News Service, is cooperating in a plan to pick…
  • p. 179 …useful group in order to get its cooperation with the Political Center. (CONTINUED) - TOP SECRET LL…
  • p. 205 …Discussion was specific and detailed but cordial and cooperative. Working-level liaison has been establ shedbetieen…
  • p. 229 …Lie hesitates to expand his cooperation with OSO, but has agreed t';furnish monthly reports on…
  • p. 230 …Lay, NSC, express~d apprecistion and~s 5ristlon for high degree of cooperation and assistance 'kitdered…
  • p. 231 …to remedyia' ituation which- -P- be4 exteaemely cooperative witfri.)SO/Athens auring- the could be disastrous…
TOP SECRET
DIRECTOR'S LOG
'TE OF DATE 8:30 AM,13 Nov. - 8:30 AM,14 Nov.
)CUMENT RECEIVED FROM TO SUBJECT ACTION
Training
Arrangements have been completed to cnduct. beginning
Monday, 12 November, short-term training programs for
military personnel assigned to CIA but awaiting full
clearance. Entrance dates for these groups will be
every three weeks. The training period will be 3 weeks,
or as much longer as is required for full clearance.
Training will comprise appropriate individual work
projects, attendance at lectures and discussions of
the Unclassified Training Group A, a course in Reading
Improvement, and a general reading project.
AI:Project ISOLATION (Camp Peary) Air Training Branch
personnel have inspected the site for location of air.strip
and jump ground and Maritime instructers have visited the
site to prepare requirements for Ma i1me activities.
In Project ZRCORSET (Grand Bahama island) conferences Conferences con-
were held in accordance with DD/A directive for establish- tinuing.
ment of .AEC cover, Initial AEC reaction was unfavorable.
OR
The ORR Panel of Aeronautical Consultants (consisting of
some 32 knowledgeable persons in the aircraft industry,
the air research and development field, the US air power
program, the Weapons Systems Eiraluation Group', the USAF,
the Office of Naval Intelligence, and CIA airintelligence
personnel) concluded a 4-day meeting discussing better
ways to evaluate the economic input capabilities and
vulnerabilities of the Soviet air power, The ,full pro-
ceedings were recorded, are now being studied' -and will
prove of value in focussing ORR efforts into the most
productive channels.
COi # OF 5.
TOP SECRET -..

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 239 pages are in the text index: search them above, or from the library's search.