Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 18 …Leghorn persuaded his superiors to submit his suggestion to the . Pentagon for funding. He had not…
  • p. 20 …Meanwhile Leghorn, frustrated by the rejection of his original concept, had transferred to the Pentagon in…
  • p. 22 …become the assistant director of Lockheed's Advanced Development Program, was in the Pentagon on business…
  • p. 24 …for the construction and maintenance of 30 aircraft to a group of senior Pentagon officials that…
  • p. 26 …He had been present at Kelly Johnson's presentation on the CL-282 at the Pentagon…
  • p. 27 …with Strong in the Pentagon on 12 May 1954. six days before the Wright Air Development…
  • p. 52 …Late on the morning of 2 December 1954, Dulles told Bissell to go to the Pentagon…
  • p. 91 …1-le then briefed a high-level Pentagon panel that included the Secretary of the Air…
  • p. 92 …After a half hour passed, the base commander called the Pentagon to ask where the crippled…
A-2 camera being installed
in U-2
005653421 UNCLASSIFIED
Sec OFORN
Chapter
77
iree -
•
• • :
,.r. ' — ,... • - ..,. •
• s •
,••??,,,,_
have CIA act as executive agent for this transaction, which the Air
Force called Project DRAGON LADY. To maintain secrecy, the Air
Force transferred funds to the CIA, which then placed an order with
Lockheed for 29 U-2s in configurations to be determined by the Air
Force. The Air Force later bought two more U-2s, for a total of 31.
The aircraft purchased for the Air Force were known as the
Follow-On Group, which was soon shortened to FOG.'n
Once enough pilots had been trained, Project AQUATONE man-
agers concentrated on checking out the complete U-2 system: planes,
pilots, navigation systems, life-support systems, and cameras. From
10 through 14 April 1956, U-2s equipped with A-2 cameras took off
nd made eight overflights of the United States in order
o teste various flight and camera systems as part of the standard
Air Force Operational Readiness Inspection. Colonel Yancey and his
detachment served as observers during this weeklong exercise.
EO 129581.610111>10<25Yrs
(Si
05-A History, chap. 5. pp. 25-26 (TS Codcword).
et
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.