Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
CO5653421 UNCLASSIFIED
Chapter 2
76
(0129581.13[111[1]>10<25Yrs
[S]
and could not survive the stresses of loops and barrel rolls. Moreover,
the original U-2s were placarded, which meant that they could not be
flown at sea level faster than 190 knots in smooth air or 150 knots in
rough air. At operational altitude, where the air was much less dense,
they could not exceed Mach 0.8 (394 knots). Speeds in excess of
these limits could cause the wings or tail section to fall off.
Airspeed was a very critical factor for the U-2. At maximum alti-
tude only 6 knots separated the speeds at which low-speed stall and
hi g h-speed buffet occurred. Pilots called this narrow range of accept-
able airspeeds at maximum altitude the "coffin corner" because at
this point the U-2 was always on the brink of falling out of the sky. If
the aircraft slowed beyond the low-speed stall limit, it would lose lift
and begin to fall, causing stresses that would tear the win g s and tail
off. A little too much speed would lead to buffeting, which would
also cause the loss of the wings or tail. Flying conditions such as
these required a U-2 pilot's full attention when he was not usin g the
autopilot. Airspeed was such a critical factor that Kelly Johnson
added a vernier adjustment to the throttle to allow the pilot to make
minute alterations to the fuel supply.'4
Amon g the unique devices developed for the U-2 was a small
sextant for making celestial "fixes" during the long overflights.
Because cloud cover often prevented U-2 pilots from locatin g navi g a-
tional points on the earth through the periscope, the sextant turned out
to be the pilots' principal navigational instrument during the first
three years of deployment. When clouds were not a factor, however.
the periscope proved highly accurate for navigation. During the final
tests before the aircraft became operational. U-2 pilots found they
could navigate by dead reckoning with an error of less than 1 nautical
mile over a 1,000-nm course."
FINAL TESTS OF THE U-2
Flight-testing of the U-2 continued throughout the fall and winter of
1955-56 in order to test all the various systems. By mid-January
1956. SAC officials were so impressed that they also wanted to pur-
chase a fleet of these planes. On 30 January. DCI Dulles agreed to
" Cunningham interview (TS Codeword): John Parangosky. interview by Donald E.
Welzenbach. tape recording. 6 March 1986 (S): inrormation supplied by
o Donald E. Welzenbach (S).
" Cunningham interview (TS Codeword).
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.