Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
Secr
Chapter 2
70
First flight of the U-2,
4 August 1955
CO5653421 UNCLASSIFIED
With Kelly Johnson watching from a chase plane and giving a con-
stant stream of instructions, LeVier made three more unsuccessful
landing attempts. With the light fading and a thunderstorm fast ap-
proaching from the mountains to the west, LeVier made one last ap-
proach using the method he had advocated: letting the aircraft touch
on its rear wheel first. This time the U-2 made a near-perfect landing,
which came just in the nick of time. Ten minutes later, the thunder-
storm began dumping an unheard-of 2 inches of rain, flooding the dry
lakebed and making the airstrip unusable.''
Now that the first problems in flying and landing the U-2 had
been worked out, Kelly Johnson scheduled the "official" first flight
for 8 August 1955. This time outsiders were present, including
Richard Bissell, Col. Osmond Ritland, Richard Horner, and Garrison
Norton. The U-2 flew to 32,000 feet and performed very well. Kelly
Johnson had met his eight-month deadline."
" Ibid.. pp. 21-22: Johnson, "Log for Project X," 4 August 1955.
" Johnson. "Log for Project X," 8 August 1955.
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.