Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
ORN
Chapter 2
69
005653421 UNCLASSIFIED
followed on I August. LeVier accelerated to 70 knots and began to try
the ailerons. "It was at this point that I became aware of being air-
borne." LeVier noted afterward, -which left me with utter amaze-
ment, as I had no intentions whatsoever of flying. I immediately
started back toward the ground, but had difficulty determining my
height because the lakebed had no markings to judge distance or
height. I made contact with the ground in a left bank of approximately
10 degrees." The U-2 bounced back into the air, but LeVier was able
to bring it back down for a second landing. He then applied the brakes
with little effect, and the aircraft rolled for a long distance before
coming to a stop."
Bissell, Cunningham. and Johnson saw the aircraft fall and
bounce. Leaping into a jeep, they roared off toward the plane. They
signaled to LeVier to climb out and then used fire extinguishers to put
out a tire in the brakes. At a debriefing session that followed. LeVier
complained about the poor performance of the brakes and the absence
of markings on the runway. Damage to the prototype U-2 was very
minor: blown tires, a leaking oleostrut on the undercarriage, and dam-
aged brakes. This unplanned flight was but a foretaste of the airwor-
thiness of the U-2. New pilots all had difficulty in getting the U-2's
wheels on the ground because at low speeds it would remain in
ground effect and glide effortlessly above the runway for great dis-
tances.
Taxi trials continued for one more day and were followed by the
first planned flight on 4 August 1955. LeVier was again at the con-
trols and had been instructed by Kelly Johnson to land the U-2 by
making initial contact with the main or forward landing gear and let-
ting the plane settle back on the rear wheel. LeVier had disagreed
with this approach. believing that the U-2 would bounce if he tried to
touch down on the forward gear first. After flying the aircraft up to
8,000 feet, LeVier leveled off and began cycling the landing gear up
and down: then he tested the flaps and the plane's stability and control
systems. Finally. LeVier made his first landing approach. As the U-2
settled down, the forward landing gear touched the runway and the
plane skipped and bounced into the air. LeVier made a second attempt
to land front wheels first, and again the plane bounded into the air.
Transcripts of the test pilots and observers' comments on the initial U-2 test tlights
have been published in "Secret First Flight of Article 001," Spyp/anes vol. 2, 1988, pp.
64-71. 82-85.
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.