This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.
“Headquarters”18 pages
- p. 22 …Bell was still being developed.''
Air Force headquarters soon approved Martin's proposal to mod-
ify…
- p. 55 CO5653421 UNCLASSIFIED
E0129581.6(dlill>10<25Yrs
ISI personnel divided among project headquarters, a US test…
- p. 73 …On 3 August 1955, Dulles
and Twining met at SAC headquarters in Omaha to sign the…
- p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword).
" Brig. Gen. Leo…
- p. 102 …U-2 project officer, the Air Force Headquarters
project officer, and NACA's top official, Dr…
- p. 107 …did not have to report to higher headquarters. WRSP-1,
known within the Agency as Detachment…
- p. 117 …Late on the evening of 3
July, Bissell went to project headquarters in the Matomic Building…
- p. 127 …The PARAMOUNT
Committee worked inside PID headquarters in the Steuart Building.
Composed of members from CIA…
- p. 138 …and prom tly reported
the conversation to headquarters. When details of close call
reached Washington, James…
- p. 153 …of Detachment A achieved excellent
results, project headquarters had already decided that Western Europe
was not…
- p. 194 …Because the new government
had not been briefed on the U-2, Project Headquarters refused to…
- p. 205 …its own building to the new
CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
- p. 312 …that the performance of an
A-12 with 175 engines (as suggested by project headquarters for…
- p. 319 …12958 1.61111111>1010<25Yrs
(Si
Project Headquarters in Langley_planned and directed all
operational BLACK…
- p. 323 …Project headquarters informed Deputy Defense
Secretary Vance on 10 January 1967 that the A- 12s would…
- p. 324 …President Johnson con-
firmed this decision on 21 May.'"
- - Project headquarters selected 8 June 1968 as…
- p. 334 …Air Force personnel served at all levels of the recon-
naissance program, from project headquarters to…
- p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October
1965 (Top Secret Codeword).
Interview with…
Skunk Works Design Staff
005653421 UNCLASSIFIED
—9eepe4.111QECIaLL
Chapter 2
46
speed of Mach 0.8 or 460 knots at altitude. Its initial maximum alti-
tude would be 70,600 feet and the ultimate maximum altitude would
be 73,100 feet. According to these early December 1954 specifica-
tions, the new plane would take off at 90 knots, land at 76 knots, and
be able to glide 244 nautical miles from an altitude of 70,000 feet.
After discussing the reconnaissance bay with James Baker, Johnson
had worked out various equipment combinations that would not ex-
ceed the weight limit of 450 pounds. Johnson ended his report by
promising the first test flight by 2 August 1955 and the completion of
four aircraft by 1 December 1955.'"
Kelly Johnson, -A High-Altitude Reconnaissance Aircraft, - 9 December 1954,
Lockheed Contract Files, OSA Records (S).