Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 22 …Bell was still being developed.'' Air Force headquarters soon approved Martin's proposal to mod- ify…
  • p. 55 CO5653421 UNCLASSIFIED E0129581.6(dlill>10<25Yrs ISI personnel divided among project headquarters, a US test…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword). " Brig. Gen. Leo…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 138 …and prom tly reported the conversation to headquarters. When details of close call reached Washington, James…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 312 …that the performance of an A-12 with 175 engines (as suggested by project headquarters for…
  • p. 319 …12958 1.61111111>1010<25Yrs (Si Project Headquarters in Langley_planned and directed all operational BLACK…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A- 12s would…
  • p. 324 …President Johnson con- firmed this decision on 21 May.'" - - Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the recon- naissance program, from project headquarters to…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
CO5653421 UNCLASSIFIED
te'Zre04QESZ.RN
Chapter 1
34
The letter had two attachments: a two-page summary of a com-
plete operational plan for organizing, building, and deploying the
CL-282 within a period of 20 months at a cost of $22 million and a
three-page memorandum, entitled "A Unique Opportunity for
Comprehensive Intelligence."
Aware of Dulles's preference for classical intelligence work, the
Project Three memorandum stressed the superiority of the CL-282
program over traditional espionage methods:
We believe that these planes can go where we need to have them
go efficiently and safely, and that no amount of fragmentary and
indirect intelligence can be pieced together to be equivalent to
such positive information as can thus be provided.60
The Land committee memorandum also stressed the need for the
CIA to undertake such reconnaissance missions rather than the Air
Force, noting that "For the present it seems rather dangerous for one
of our military arms to engage directly in extensive overflight." The
committee members also listed the advantages of using the CL-282
rather than an Air Force aircraft:
The Lockheed super glider will fly at 70,000 feet, well out of the
reach of present Russian interceptors and high enough to have a
good chance of avoiding detection. The plane itself is so light
(15,000 pounds), so obviously unarmed and devoid of military
usefulness, that it would minimize affront to the Russians even if
through some remote mischance it were detected and identi-
fied.6'
One additional advantage of the Lockheed design over the Air
Force's proposed high-altitude reconnaissance aircraft was a faster
completion time. Kelly Johnson had promised the Land committee
that his aircraft would be flying by August 1955, just eight months
after he proposed to start construction. The Bell X-16 prototype was
not scheduled for completion before the spring of 1956.
The strong advocacy of Killian and the other scientists on the
various advisory committees concerned with overhead reconnais-
sance, combined with President Eisenhower's support, finally won
Memorandum for DCI Allen F. Dulles from Project Three Panel, "A Unique
Opportunity for Comprehensive Intelligence," 5 November 1954, p. 3 (TS, downgraded to
S) in OSA History, chap. I. annex I (TS Codeword).
Ibid.
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.