Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 24 …Instead of a conventional landing gear, Johnson proposed using two skis and a reinforced belly rib…
  • p. 25 …a perceived shortcoming of the Lockheed design."' Another factor in the rejection of Kelly Johnson's…
  • p. 26 …interview by Donald E. Welzenbach, Corona del Mar. California. 20 May 1985 (S). Johnson, "Log for…
  • p. 27 …Gardner described Kelly Johnson's proposal and showed the drawings to Strong. After this meeting. Strong…
  • p. 30 …To make Kelly Johnson's revolutionary design a reality, one additional source of support was necessary…
  • p. 42 …When James Killian asked Land to head Project Three, Land had to make a major decision…
  • p. 48 …do the job in Johnson's airplane. And further, 1 overlaid a curve showing that with…
  • p. 57 …demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed…
  • p. 58 …a week after he had been authorized to begin the project, Kelly Johnson wrote a 23…
  • p. 69 …project staff) flew LIZ with Kelly Johnson in a small Beechcraft plane piloted by eed's…
  • p. 72 …This responsibility has placed a heavy burden on the Office of Security for establishing procedures to…
  • p. 79 …Batlin suggested the method used by Nazi war criminal Hermann Goering, a thin glass ampule containing…
  • p. 81 …Kelly Johnson used a "wet-wing" design for the U-2, which meant that fuel was…
  • p. 89 …Airspeed was such a critical factor that Kelly Johnson added a vernier adjustment to the throttle…
  • p. 162 …By late 1957, Johnson agreed that something had to be done. After a series of tests…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 324 …OXCART did win a temporary reprieve in late November 1967. The Johnson administration decided to keep…
CO5653421 UNCLASSIFIED
te'Zre04QESZ.RN
Chapter 1
34
The letter had two attachments: a two-page summary of a com-
plete operational plan for organizing, building, and deploying the
CL-282 within a period of 20 months at a cost of $22 million and a
three-page memorandum, entitled "A Unique Opportunity for
Comprehensive Intelligence."
Aware of Dulles's preference for classical intelligence work, the
Project Three memorandum stressed the superiority of the CL-282
program over traditional espionage methods:
We believe that these planes can go where we need to have them
go efficiently and safely, and that no amount of fragmentary and
indirect intelligence can be pieced together to be equivalent to
such positive information as can thus be provided.60
The Land committee memorandum also stressed the need for the
CIA to undertake such reconnaissance missions rather than the Air
Force, noting that "For the present it seems rather dangerous for one
of our military arms to engage directly in extensive overflight." The
committee members also listed the advantages of using the CL-282
rather than an Air Force aircraft:
The Lockheed super glider will fly at 70,000 feet, well out of the
reach of present Russian interceptors and high enough to have a
good chance of avoiding detection. The plane itself is so light
(15,000 pounds), so obviously unarmed and devoid of military
usefulness, that it would minimize affront to the Russians even if
through some remote mischance it were detected and identi-
fied.6'
One additional advantage of the Lockheed design over the Air
Force's proposed high-altitude reconnaissance aircraft was a faster
completion time. Kelly Johnson had promised the Land committee
that his aircraft would be flying by August 1955, just eight months
after he proposed to start construction. The Bell X-16 prototype was
not scheduled for completion before the spring of 1956.
The strong advocacy of Killian and the other scientists on the
various advisory committees concerned with overhead reconnais-
sance, combined with President Eisenhower's support, finally won
Memorandum for DCI Allen F. Dulles from Project Three Panel, "A Unique
Opportunity for Comprehensive Intelligence," 5 November 1954, p. 3 (TS, downgraded to
S) in OSA History, chap. I. annex I (TS Codeword).
Ibid.
ret
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.