This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to alti- tudes never before attained in sustained…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover re…
  • p. 138 …Then in January 1960, the commander of Detachment B, raised an important question that had never…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its orig- inal U-2s with the J75 engines." Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on I May 1960 proved to be the…
  • p. 223 …Responsibility for photo- graphic coverage of Cuba remained with the Air Force; Agency pilots never flew…
  • p. 264 Sratrt.11/Qt2.1....31■1 Chapter 5 251 005653421 UNCLASSIFIED There was never another Agency…
  • p. 290 …the OXCART aircraft for its own use. never adopted the laminated vertical stabilizers.'4 THE OXCART…
  • p. 294 …Scott employed concepts never be- fore used in camera systems. These included the use of a…
  • p. 298 …As it turned out, the J58 was never used in a Navy aircraft. OSA History. chap…
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and locktin modes, a fact that…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …its speed and altitude have never been equaled. The development of this aircraft also led to…
-0O5653421 UNCLASSIFIED
Se t
Chapter 6
297
decided to gol land take charge of the OXCART's develop-
ment himself. His presence made a big difference, as can be seen in
his notes in the project log:
I uncovered many items of a managerial, materiel and design na-
ture.... I had meetings with vendors to improve their opera-
tion.... Changed supervision and had daily talks with them,
going over in detail all problems on the aircraft.... Increased the
supervision in the electrical group by 500%.... We tightened up
the inspection procedures a great deal and made inspection stick.
It appears that the problems are one-third due to bum engineer-
ing.... The addition of so many systems to the A-I2 has greatly
complicated the problems, but we did solve the overall problenz."
These improvements in on-site management got the project back on
schedule.
By 20 November 1965, the final validation flights for OXCART
deployment were finished. During these tests, the OXCART achieved
a maximum speed of Mach 3.29, an altitude of 90,000 feet, and sus-
tained flight time above Mach 3.2 of 74 minutes. The maximum
- egdurance test lasted six hours and 20 minutes. On 22. November.
Kelly Johnson wrote to Brig. Gen. Jack C. Ledford. head of the
Office of Special Activities, stating, -The time has come when the
bird should leave its nest.'
Three years and seven months after its first flight in April 1962,
the OXCART was ready for operational use. It was now time to find
work for the most advanced aircraft ever conceived and built.
ED 129581.61[11111>1010425Yrs
(Si
"OXCART Story," p. 23 (S).
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. 406 pages are in the text index: search them above, or from the library's search.