This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 6 …Project OXCART, 1956-1968 The Evaluation of Designs for a Successor to the U-2 260…
  • p. 22 …retired from the Air Force to become the assistant director of Lockheed's Advanced Development Program…
  • p. 24 ORN Chapter 1 11 Kelly Johnson %.419r.,‹ 005653421 UNCLASSIFIED gravity (g's) instead of the military…
  • p. 27 …He later advanced to the rank of brigadier general in the reserve. For Strong's contacts…
  • p. 32 …lithium deuteride, a tech- nology more advanced than the heavy water method used by US BEACON…
  • p. 33 …between the developed and undeveloped nations. This aggressive Soviet foreign policy, combined with advances in nuclear…
  • p. 58 …secrecy in the new project, Kelly Johnson placed it in Lockheed's Advanced Development facility at…
  • p. 65 …His software algorithms made it possible to model lens designs and determine in advance the effects…
  • p. 76 …UNCLASSIFIED """"Igeret-ALQ Chapter 2 63 advanced gear for the U-2 pilots. David Clark expert…
  • p. 111 …of Soviet advances in long-range bombers and missiles. The initial sighting of the new Soviet…
  • p. 114 …Adenauer be informed in advance of US plans to overfly the Soviet Union from bases in…
  • p. 174 …concentrating on developing the more advanced solid-fueled missiles rather than increasing the num- ber of…
  • p. 191 …the cover story that had been prepared and distributed in advance of the mission. The first…
  • p. 250 …so urgent that the Defense Department finally re ente CO5653421 UNCLASSIFIED Advanced ECM Equipment for Demand…
  • p. 265 …the U-2R needed a camera that incorporated the many im- portant advances that had occurred…
  • p. 266 …This camera was actually a very advanced version of the original B camera with a new…
  • p. 282 …aircraft from the small inventory of its most advanced bomber. Even had the B-58B program…
  • p. 295 …In fact, it was an advanced version of the highly reliable B camera developed for the…
  • p. 307 …he an- nounced the successful development of an -advanced experimental jet aircraft, the A-11. which…
  • p. 310 …It was now time to find work for the most advanced aircraft ever conceived and built…
  • p. 321 …advanced aircraft ever built was to be put out to pasture. The aban- donment of the…
  • p. 325 …when the OXCART program ended in the summer of 1968, no more advanced successor was wait…
  • p. 326 …The most advanced aircraft of the 20th century had become an anachronism before it was ever…
  • p. 333 …ADVANCES IN TECHNOLOGY One very important byproduct of the CIA's manned reconnaissance program was the…
  • p. 334 …the end of the usefulness of the world's most advanced aircraft; its offspring, the SR…
  • p. 335 …Thus, the CIA sponsored the development of the world's most advanced aircraft—the OXCART—and…
—aagarAti-Peerorkr-
Chapter 6
286
ED 129581.6M11>101045Yrs
1S1
DELIVERY OF THE FIRST OXCART
The first A- 12, known as article 121, was assembled and tested at
Burbank during January and February 1962. Since it could not be
flown to the site, the aircraft had to be partially disassembled
and put on a specially designed trailer that cost nearly S100,000. The
entire fuselage, without the wings, was crated and covered, creating a
load 35 feet wide and 105 feet long. To transport this huge load safely
over the hundreds of miles to the site, obstructing road signs were re-
moved, trees were trimmed, and some roadbanks had to be leveled.
The plane left Burbank on 26 February 1962 and arrived at
two days later.
After the fuselage arrived in Nevada. its wings were attached and
the J75 engines were installed, but the aircraft was still not ready to be
tested. This new delay was caused by leaking fuel tanks, a problem
that would never be solved completely. Because the A-12's high
speeds heat the titanium airframe to more than 500°F. Lockheed
designers had to make allowances for expansion. When the metal was
cold, the expansion joints were at their widest. In the fuel tanks, these
zaps were tilled by pliable sealants. but the fuel for the A-12's engines
acted as a strong reducin g agent that softened the sealants. causing
leaks. Thus, when fuel was first poured into the aircraft, 68 leaks
developed. Lockheed technicians then stripped and replaced all the
sealant, a tedious and time consuming procedure because the sealant
required four curing cycles, each at a different temperature over a
period of 30 to 54 hours. The engineers were never able to discover a
sealant compound that was completely impervious to the jet fuel while
remainin g elastic enough to expand and contract sufficiently. The
A-12's tanks continued to leak, so when it was fueled, it only received
enough fuel to get airborne. The plane would then rendezvous with a
tanker, top off its tanks. and immediately climb to operating altitude,
causing the metal to expand and the leaks to stop.'"
CHANGES IN THE PROJECT MANAGEMENT
Richard Bissell, whose concern for the viability of the U-2 in 1956
had led to the establishment of Project OXCART and who had di-
rected its growth all along, was no longer in charge when the first
OSA History, chap. 20. p. 62 ITS Codewort0;" "OXCART Story." p I I (S)
UNCLASSIFIED

Not linked to a story yet.