Documents / FOIA release

/specialCollection/MissileGap/1992/1992-04-01.pdf

Central Intelligence Agency · 406 pages · text from the file's own layer

This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.

  • p. 4 …Search for a New Reconnaissance Aircraft 8 Lockheed CL-282 Supporters and the CIA 13 Scientists…
  • p. 6 …260 Competition Between Lockheed and Convair 267 The Selection of the Lockheed Design 270 Efforts To…
  • p. 12 …excellent technical study of the U-2: Lockheed U-2 (1983). E0129581.131d111>10<25Yrs…
  • p. 21 …August 1953, OS1 records (S). " Jay Miller, Lockheed U-2, Aerograph 3 (Austin, Texas: Aerofax, 1983…
  • p. 22 …Immediately after returning to California, Carter proposed to Lockheed Vice President L. Eugene Root (previously the…
  • p. 23 …high-altitude reconnaissance aircraft Chapter 1 10 Lockheed also submit a design. Carter noted that the…
  • p. 24 …Miller, Lockheed U-2, p. 12. For more details on Kelly Johnson's original proposal. see…
  • p. 25 12 The Lockheed CL-282 CO5653421 UNCLASSIFIED Chapter 1 Development Planning. According to Wienberg, General LeMay…
  • p. 26 …Despite the Air Force's selection of the X-16, Lockheed continued to work on the…
  • p. 27 …six days before the Wright Air Development Command began to evaluate the Lockheed proposal. Gardner described…
  • p. 28 …range are not as good as the Lockheed CL-282. Gardner's enthusiasm for the CL…
  • p. 29 …Few details about Dulles's precise attitude toward the proposed Lockheed reconnaissance aircraft are available, but…
  • p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal still lacked official support…
  • p. 37 …ISP chairman Baker then urged Donovan to travel to southern California to evaluate the Lockheed design…
  • p. 39 …Thus, even though the Lockheed CL-282 had several important sources of support by September 1954…
  • p. 40 …Council.46 Project Three Support for the Lockheed CL-282 Even before the final Technological Capabilities…
  • p. 42 …Agency.49 Land learned the details of Lockheed's proposed CL-282 aircraft soon after he…
  • p. 43 …Chapter 1 30 briefly mention a Lockheed design for a high-flying aircraft at the 24…
  • p. 44 …During September and October the Project Three study group met frequently to discuss the Lockheed design…
  • p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the reach of…
  • p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials ar- gued that the Bell…
  • p. 49 …He used Gardner's statement to convince Lockheed's senior management to approve the project, which…
  • p. 50 …small group of prominent scientists that the Lockheed design represented the best possible overhead reconnais- sance…
  • p. 52 …afternoon of 3 December, they Although the Lockheed CL-282 was not designated as the U…
  • p. 53 …Eventually Bissell asked who was going to pay for the airframes to be built by Lockheed…
  • p. 55 …This category in- cluded maintenance personnel from Lockheed (five per aircraft), the pilots, and support personnel…
  • p. 57 …Then on 22 December 1954, the Agency signed a letter contract with Lockheed, using the codename…
  • p. 58 …The U-2 would have a The Lockheed "Skunk Works" was named after the Kickapoo Joy…
  • p. 59 …Johnson, -A High-Altitude Reconnaissance Aircraft, - 9 December 1954, Lockheed Contract Files, OSA Records (S). UNCLASSIFIED
  • p. 61 …Reconnaissance Aircraft, Lockheed Aircraft Corporation Report 10420. 28 January 1955. pp. 7-9, OSA Recordsi \ (5…
  • p. 63 …1954, even before the CIA adopted the Lockheed proposal. Baker quickly recognized, however, that he would…
  • p. 69 …Miller, Lockheed U-2. pp. 19-20. Sè'biet UNCLASSIFIED
  • p. 74 …aircraft—remained the ex- clusive province of Lockheed:9 As a result of this agreement, CIA…
  • p. 77 …The first model of the pressure suit, used by Lockheed test pilots, made no provision for…
  • p. 79 …Geary told Culbertson that the Lockheed CL-282 was going to be known officially as the…
  • p. 81 …former director of Lockheed's Skunk Works, to Donald E. Welzenbach, 14 March 1986 (U): Miller…
  • p. 84 …7 (TS Codeword); Miller, Lockheed U-2, p. 22. OSA History, chap. 8, pp. 12-14…
  • p. 85 …how to transfer Lockheed employees from Burbank to Iwithout arousing a great deal of curiosity. The…
  • p. 88 …Colonel Yancey was in charge of six SAL pilots who were to be trained by Lockheed…
  • p. 90 …CIA, which then placed an order with Lockheed for 29 U-2s in configurations to be…
  • p. 107 …U-2 cover story stating that a Lockheed-developed aircraft would be flown by the USAF…
  • p. 143 …Lockheed mechanics had mounted the various RAINBOW devices on the prototype U-2, a Lockheed test…
  • p. 144 …Unable to restart the power plant, Lockheed test pilot Robert Sicker bailed out but was struck…
  • p. 145 …The loss of one of Lockheed's best test pilots, as well as the pro- totype…
  • p. 157 …As a substitute, Lockheed began working to develop a paint with radar-suppressant qualities, but this…
  • p. 162 …a series of tests over Edwards AFB. Lockheed began coating the 11-2s with a standard…
  • p. 188 …Although it haL refurbished by Lockheed and now had the more powerful 175 engine that would…
  • p. 200 …Beschloss claims that Powers was fired by Lockheed for criticizing the Agency in his memoirs (which…
  • p. 209 …Some poetic justice in this.' One week later Colonel Geary called to order Lockheed to up…
  • p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that they could be refueled in…
  • p. 220 …story, which was that its pilots were Lockheed employees on a ferry flight to Puerto Rico…
  • p. 230 …CO5653421 UNCLASSIFIED Chapter 5 Late in 1958, Lockheed began refitting the Agency's 13 remaining U…
  • p. 264 …1966 decided to place an order with Lockheed for ei g ht more aircraft to be…
  • p. 265 …Francis Gary Powers was one of the Lockheed test pilots who checked out this new aircraft…
  • p. 266 …began coming off the production line at Lockheed in-the autumn of 1968, CIA and the…
  • p. 273 …SP-1362, "History of the OXCART Program," Lockheed Aircraft Corporation, Burbank, CA. 1 July 1968, p…
  • p. 275 …Personnel at Lockheed's Skunk Works referred to these aircraft concepts as "Archangel-1," "Archangel-2…
  • p. 276 RN Chapter 6 263 Johnson, "Archangel log," 17-24 CO5653421 UNCLASSIFIED Lockheed design for a hydrogen…
  • p. 280 …During the first half of 1959, both Lockheed and Convair worked to reduce the radar cross…
  • p. 281 …In early June, Lockheed submitted a design for a ground-launched aircraft known as the A…
'OXCART Story.-
005653421 UNCLASSIFIED
SecrefT
Chapter 6
284
EO 129581.61d1[11>1010<25Yrs
(Si
storage capacity, and runway length were insufficient for the
OXCART program, the site's remote location would greatly ease the
task of maintaining the program's security, and a moderate construc-
tion program could provide adequate facilities. Construction began in
September 1960; a C-47 shuttle service ferried work crews from
Burbank to Las Vegas and from Las Vegas to the site.
The new 8,500-foot runway was completed by 15 November
1960. Kelly Johnson had been reluctant to have a standard Air Force
runway with expansion joints every 25 feet because he feared the
joints would set up undesirable vibrations in the speedy aircraft. At
his suggestion a 150-foot wide runway was therefore constructed of
six 25-foot-wide longitudinal sections, each 150 feet long but stag-
gered. This layout put most of the expansion joints parallel to the di-
rection of aircraft roll and reduced the frequency of the joints.
Additional improvements included the resurfacing of 18 miles of
hi g hway leading to the base so that heavy fuel trucks could bring in
the necessary fuel. The need for additional buildings on the base was
met by the Navy. Three surplus Navy hangars were dismantled,
moved, and reassembled on the north side of the base, and more than
100 surplus Navy housing buildings were also transported to
All essential facilities were ready in time for the forecast delivery
date of the first A-12 on 1 August 1961.'
Unfortunately, this delivery date began to slip further and further
into the future. Delays in obtaining the titanium, and later the 158 en-
gines, caused the postponement of the final assembly of the first plane.
Eventually, Kelly Johnson and Agency project officials decided to be-
gin testing without waiting for the 158 engines by using Pratt &
Whitney J75/ I9W engines, designed for the Convair F-106, to test the
A-12 at altitudes up to 50,000 feet and at speeds up to Mach 1.6. Such
a change, however, meant that the en g ine compartment of the first air-
craft had to be reconfigured to accommodate the J75 en g ine. Lockheed
hoped that this substitution would permit the delivery of the first A-12
by 22 December 1961 and its initial test flight by 27 February 1962.
Lockheed ran into so many technological problems with the
OXCART effort that by October 1961 its costs had swollen to $136
million and were still climbing. Something obviously had to be done
OSA Histbry. chap. 20. pp. 39-40, 43, 51 (TS Codcword)
pp. 7-9 (S).
UNCLASSIFIED

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. 406 pages are in the text index: search them above, or from the library's search.