This is a CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, published in Washington in 1992 and approved for release in 2011. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974, which developed and flew the U-2 and the A-12 OXCART. It traces the U-2's development, the overflights of the Soviet Union, the downing of Francis Gary Powers on 1 May 1960, and later operations. One section is titled U-2s, UFOs, and Operation BLUE BOOK.
“Headquarters”18 pages
- p. 22 …Bell was still being developed.''
Air Force headquarters soon approved Martin's proposal to mod-
ify…
- p. 55 CO5653421 UNCLASSIFIED
E0129581.6(dlill>10<25Yrs
ISI personnel divided among project headquarters, a US test…
- p. 73 …On 3 August 1955, Dulles
and Twining met at SAC headquarters in Omaha to sign the…
- p. 74 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (TS Codeword).
" Brig. Gen. Leo…
- p. 102 …U-2 project officer, the Air Force Headquarters
project officer, and NACA's top official, Dr…
- p. 107 …did not have to report to higher headquarters. WRSP-1,
known within the Agency as Detachment…
- p. 117 …Late on the evening of 3
July, Bissell went to project headquarters in the Matomic Building…
- p. 127 …The PARAMOUNT
Committee worked inside PID headquarters in the Steuart Building.
Composed of members from CIA…
- p. 138 …and prom tly reported
the conversation to headquarters. When details of close call
reached Washington, James…
- p. 153 …of Detachment A achieved excellent
results, project headquarters had already decided that Western Europe
was not…
- p. 194 …Because the new government
had not been briefed on the U-2, Project Headquarters refused to…
- p. 205 …its own building to the new
CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
- p. 312 …that the performance of an
A-12 with 175 engines (as suggested by project headquarters for…
- p. 319 …12958 1.61111111>1010<25Yrs
(Si
Project Headquarters in Langley_planned and directed all
operational BLACK…
- p. 323 …Project headquarters informed Deputy Defense
Secretary Vance on 10 January 1967 that the A- 12s would…
- p. 324 …President Johnson con-
firmed this decision on 21 May.'"
- - Project headquarters selected 8 June 1968 as…
- p. 334 …Air Force personnel served at all levels of the recon-
naissance program, from project headquarters to…
- p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October
1965 (Top Secret Codeword).
Interview with…
--Irrefet-44
Chapter 6
269
Lockheed A-11
UNCLASSIFIED
to be ignited. Since ramjet engines had only been tested in wind tun-
nels, there was no available data to prove that these engines would
work in the application proposed by Convair. The second uncertain
factor was the B-58B bomber that was supposed to achieve Mach 2.2
before launching the FISH above 35,000 feet. This version of the
B-58 was still in the design stage.
Convair's proposal suffered a major setback in June 1959, when
the Air Force canceled the B-58B project. Conversion of the older,
slower B-58A into a supersonic launching platform for the FISH was
ruled out by the high cost and technical difficulties involved.
Moreover, the Air Force was unwilling to part with two aircraft from
the small inventory of its most advanced bomber. Even had the B-58B
program not been canceled, however, the FISH proposal would proba-
bly not have been feasible. Convair engineers had calculated that the
added weight of the FISH would prevent the B-58B from achieving
the speed required to ignite the parasite aircraft's ramjet engines.
The Convair proposal was therefore unusable, but the Lockheed
design with its high radar cross section was also unacceptable to the
Land committee. On 14 July 1959, the committee rejected both
UNCLASSIFIED
Not linked to a story yet.
About this file