“Lockheed”60+ pages
- p. 4 …Search for a New Reconnaissance Aircraft 8
Lockheed CL-282 Supporters and the CIA 13
Scientists…
- p. 6 …260
Competition Between Lockheed and Convair 267
The Selection of the Lockheed Design 270
Efforts To…
- p. 12 …excellent technical study of the U-2: Lockheed U-2
(1983).
E0129581.131d111>10<25Yrs…
- p. 21 …August 1953, OS1 records (S).
" Jay Miller, Lockheed U-2, Aerograph 3 (Austin, Texas: Aerofax, 1983…
- p. 22 …Immediately after returning to California, Carter proposed to
Lockheed Vice President L. Eugene Root (previously the…
- p. 23 …high-altitude
reconnaissance aircraft
Chapter 1
10
Lockheed also submit a design. Carter noted that the…
- p. 24 …Miller, Lockheed U-2, p. 12. For more details on Kelly Johnson's original proposal.
see…
- p. 25 12
The Lockheed CL-282
CO5653421 UNCLASSIFIED
Chapter 1
Development Planning. According to Wienberg, General LeMay…
- p. 26 …Despite the Air Force's selection
of the X-16, Lockheed continued to work on the…
- p. 27 …six days before the Wright Air Development Command
began to evaluate the Lockheed proposal. Gardner described…
- p. 28 …range are not as good as the
Lockheed CL-282.
Gardner's enthusiasm for the CL…
- p. 29 …Few details about Dulles's precise attitude
toward the proposed Lockheed reconnaissance aircraft are available,
but…
- p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal
still lacked official support…
- p. 37 …ISP chairman Baker then urged Donovan to travel to
southern California to evaluate the Lockheed design…
- p. 39 …Thus, even though
the Lockheed CL-282 had several important sources of support by
September 1954…
- p. 40 …Council.46
Project Three Support for the Lockheed CL-282
Even before the final Technological Capabilities…
- p. 42 …Agency.49
Land learned the details of Lockheed's proposed CL-282 aircraft
soon after he…
- p. 43 …Chapter 1
30
briefly mention a Lockheed design for a high-flying aircraft at the
24…
- p. 44 …During September and October the Project Three study group
met frequently to discuss the Lockheed design…
- p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the
reach of…
- p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials ar-
gued that the Bell…
- p. 49 …He used Gardner's
statement to convince Lockheed's senior management to approve the
project, which…
- p. 50 …small group of prominent scientists that the
Lockheed design represented the best possible overhead reconnais-
sance…
- p. 52 …afternoon of 3 December, they
Although the Lockheed CL-282 was not designated as the U…
- p. 53 …Eventually Bissell asked who was
going to pay for the airframes to be built by Lockheed…
- p. 55 …This category in-
cluded maintenance personnel from Lockheed (five per
aircraft), the pilots, and support personnel…
- p. 57 …Then on 22 December 1954, the Agency
signed a letter contract with Lockheed, using the codename…
- p. 58 …The U-2 would have a
The Lockheed "Skunk Works" was named after the Kickapoo Joy…
- p. 59 …Johnson, -A High-Altitude Reconnaissance Aircraft, - 9 December 1954,
Lockheed Contract Files, OSA Records (S).
UNCLASSIFIED
- p. 61 …Reconnaissance Aircraft, Lockheed Aircraft Corporation Report 10420. 28 January 1955.
pp. 7-9, OSA Recordsi \ (5…
- p. 63 …1954, even before the CIA adopted
the Lockheed proposal. Baker quickly recognized, however, that he
would…
- p. 69 …Miller, Lockheed U-2. pp. 19-20.
Sè'biet
UNCLASSIFIED
- p. 74 …aircraft—remained the ex-
clusive province of Lockheed:9
As a result of this agreement, CIA…
- p. 77 …The first model of the
pressure suit, used by Lockheed test pilots, made no provision for…
- p. 79 …Geary told Culbertson that the Lockheed
CL-282 was going to be known officially as the…
- p. 81 …former director of Lockheed's Skunk Works,
to Donald E. Welzenbach, 14 March 1986 (U): Miller…
- p. 84 …7 (TS Codeword); Miller, Lockheed U-2, p. 22.
OSA History, chap. 8, pp. 12-14…
- p. 85 …how to transfer Lockheed employees
from Burbank to Iwithout arousing a great deal of curiosity.
The…
- p. 88 …Colonel Yancey was in charge of six SAL pilots who were to be
trained by Lockheed…
- p. 90 …CIA, which then placed an order with
Lockheed for 29 U-2s in configurations to be…
- p. 107 …U-2
cover story stating that a Lockheed-developed aircraft would be flown
by the USAF…
- p. 143 …Lockheed mechanics
had mounted the various RAINBOW devices on the prototype U-2, a
Lockheed test…
- p. 144 …Unable to restart the power plant, Lockheed test pilot
Robert Sicker bailed out but was struck…
- p. 145 …The loss of one of Lockheed's best test pilots, as well as the pro-
totype…
- p. 157 …As a substitute,
Lockheed began working to develop a paint with radar-suppressant
qualities, but this…
- p. 162 …a series of tests over Edwards AFB. Lockheed began coating
the 11-2s with a standard…
- p. 188 …Although it haL refurbished by
Lockheed and now had the more powerful 175 engine that would…
- p. 200 …Beschloss claims that Powers was fired by Lockheed
for criticizing the Agency in his memoirs (which…
- p. 209 …Some poetic justice in this.'
One week later Colonel Geary called to order Lockheed to up…
- p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that
they could be refueled in…
- p. 220 …story, which
was that its pilots were Lockheed employees on a ferry flight to
Puerto Rico…
- p. 230 …CO5653421 UNCLASSIFIED
Chapter 5
Late in 1958, Lockheed began refitting the Agency's 13 remaining
U…
- p. 264 …1966 decided to place an order with Lockheed for ei g ht more aircraft
to be…
- p. 265 …Francis Gary Powers was one of the Lockheed test pilots who
checked out this new aircraft…
- p. 266 …began coming off the production line at Lockheed
in-the autumn of 1968, CIA and the…
- p. 273 …SP-1362, "History of the OXCART Program,"
Lockheed Aircraft Corporation, Burbank, CA. 1 July 1968, p…
- p. 275 …Personnel at Lockheed's Skunk Works referred to
these aircraft concepts as "Archangel-1," "Archangel-2…
- p. 276 RN
Chapter 6
263
Johnson, "Archangel log," 17-24
CO5653421 UNCLASSIFIED
Lockheed design for a hydrogen…
- p. 280 …During the first half of 1959, both Lockheed and Convair
worked to reduce the radar cross…
- p. 281 …In early June, Lockheed submitted a design for a ground-launched
aircraft known as the A…
Chapter 5
205
Stosr4.%..t
CO5653421 UNCLASSIFIED
overflights of Cuban territory. He argued that the loss of an aircraft on
a mission that combined both types of flights would make it difficult
for the United States to stand on its rights to fly over international wa-
ters. Bundy and Carter therefore agreed to split the proposed recon-
naissance program into four missions: two overflights and two
peripheral flights, all planned for maximum safety. The overflights
were thus designed to be quick "in-and-out" operations across the
narrow width of the island instead of flights along the entire length of
Cuba, as had been the case previously. (As the map on page 202 illus-
trates, the 5 September mission was the last one to fly along the
length of the island.) As an additional precaution, flightpaths would
be laid out to avoid known SAM sites. Although these changes
greatly reduced the danger to the U-2, they slowed the gathering of
information on the Soviet buildup by reducing each mission's
coverage. 9
To ensure that the photographs taken by these missions were of
the highest quality. the CIA decided to conduct flights only when the
weather along the flight routes was less than 25 percent overcast.
Weather proved to be a major problem during the month of
September. Unfavorable forecasts (along with a brief standdown of
U-2 overflights after the loss pre-
vented the launching of any missions from 6 through 16 September.
Moreover, when mission 3091 finally flew on 17 September, the fa-
vorable weather forecast proved inaccurate and heavy clouds pre-
vented the mission from obtaining usable photography. Bad weather
continued to rule out missions until 26 September, when mission
3093 covered eastern Cuba and found three additional SAM sites.
Three days later mission 3095 flew over the Isle of Pines and Bay of
Pigs area, finding one more SAM site and a coastal-defense cruise
missile site."'
The cautious series of U-2 flights in September had turned up
many more SAM sites but no concrete evidence of the presence of
surface-to-surface missiles. Growing impatient with the restrictions
" Lehman Report, pp. 12-13 (TS Codeword).
DCI John A. McCone, Memorandum for the Record. "U-2 Overflights of Cuba. 29
glat jui-L „urv ut cah 14 October 1962." 27 February 1963, DCI records,'
S). Although this DC1 memo states that "the delay in completing the photo-
ge was due solely to the unfavorable weather predicted during this period."
a more contemporary COMOR memo rerrted a standdown of U-2 overflights until 16
September as a result of the loss of mission No. GRC- 127 over China on 8 September.
Memorandum for DOC! Carter from lames Q. Reber. Chairman, COMOR, "Historical
Analysis of U-2 Overflights of Cuba," 24 October 1962, IC Staff, COMIREX records
Cuba Requirements, 1961-63" (TS Ccxleword).
E0 12951 1.6fillIll>101010<25Yrs
(SI
UNCLASSIFIED