“Lockheed”60+ pages
- p. 4 …Search for a New Reconnaissance Aircraft 8
Lockheed CL-282 Supporters and the CIA 13
Scientists…
- p. 6 …260
Competition Between Lockheed and Convair 267
The Selection of the Lockheed Design 270
Efforts To…
- p. 12 …excellent technical study of the U-2: Lockheed U-2
(1983).
E0129581.131d111>10<25Yrs…
- p. 21 …August 1953, OS1 records (S).
" Jay Miller, Lockheed U-2, Aerograph 3 (Austin, Texas: Aerofax, 1983…
- p. 22 …Immediately after returning to California, Carter proposed to
Lockheed Vice President L. Eugene Root (previously the…
- p. 23 …high-altitude
reconnaissance aircraft
Chapter 1
10
Lockheed also submit a design. Carter noted that the…
- p. 24 …Miller, Lockheed U-2, p. 12. For more details on Kelly Johnson's original proposal.
see…
- p. 25 12
The Lockheed CL-282
CO5653421 UNCLASSIFIED
Chapter 1
Development Planning. According to Wienberg, General LeMay…
- p. 26 …Despite the Air Force's selection
of the X-16, Lockheed continued to work on the…
- p. 27 …six days before the Wright Air Development Command
began to evaluate the Lockheed proposal. Gardner described…
- p. 28 …range are not as good as the
Lockheed CL-282.
Gardner's enthusiasm for the CL…
- p. 29 …Few details about Dulles's precise attitude
toward the proposed Lockheed reconnaissance aircraft are available,
but…
- p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal
still lacked official support…
- p. 37 …ISP chairman Baker then urged Donovan to travel to
southern California to evaluate the Lockheed design…
- p. 39 …Thus, even though
the Lockheed CL-282 had several important sources of support by
September 1954…
- p. 40 …Council.46
Project Three Support for the Lockheed CL-282
Even before the final Technological Capabilities…
- p. 42 …Agency.49
Land learned the details of Lockheed's proposed CL-282 aircraft
soon after he…
- p. 43 …Chapter 1
30
briefly mention a Lockheed design for a high-flying aircraft at the
24…
- p. 44 …During September and October the Project Three study group
met frequently to discuss the Lockheed design…
- p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the
reach of…
- p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials ar-
gued that the Bell…
- p. 49 …He used Gardner's
statement to convince Lockheed's senior management to approve the
project, which…
- p. 50 …small group of prominent scientists that the
Lockheed design represented the best possible overhead reconnais-
sance…
- p. 52 …afternoon of 3 December, they
Although the Lockheed CL-282 was not designated as the U…
- p. 53 …Eventually Bissell asked who was
going to pay for the airframes to be built by Lockheed…
- p. 55 …This category in-
cluded maintenance personnel from Lockheed (five per
aircraft), the pilots, and support personnel…
- p. 57 …Then on 22 December 1954, the Agency
signed a letter contract with Lockheed, using the codename…
- p. 58 …The U-2 would have a
The Lockheed "Skunk Works" was named after the Kickapoo Joy…
- p. 59 …Johnson, -A High-Altitude Reconnaissance Aircraft, - 9 December 1954,
Lockheed Contract Files, OSA Records (S).
UNCLASSIFIED
- p. 61 …Reconnaissance Aircraft, Lockheed Aircraft Corporation Report 10420. 28 January 1955.
pp. 7-9, OSA Recordsi \ (5…
- p. 63 …1954, even before the CIA adopted
the Lockheed proposal. Baker quickly recognized, however, that he
would…
- p. 69 …Miller, Lockheed U-2. pp. 19-20.
Sè'biet
UNCLASSIFIED
- p. 74 …aircraft—remained the ex-
clusive province of Lockheed:9
As a result of this agreement, CIA…
- p. 77 …The first model of the
pressure suit, used by Lockheed test pilots, made no provision for…
- p. 79 …Geary told Culbertson that the Lockheed
CL-282 was going to be known officially as the…
- p. 81 …former director of Lockheed's Skunk Works,
to Donald E. Welzenbach, 14 March 1986 (U): Miller…
- p. 84 …7 (TS Codeword); Miller, Lockheed U-2, p. 22.
OSA History, chap. 8, pp. 12-14…
- p. 85 …how to transfer Lockheed employees
from Burbank to Iwithout arousing a great deal of curiosity.
The…
- p. 88 …Colonel Yancey was in charge of six SAL pilots who were to be
trained by Lockheed…
- p. 90 …CIA, which then placed an order with
Lockheed for 29 U-2s in configurations to be…
- p. 107 …U-2
cover story stating that a Lockheed-developed aircraft would be flown
by the USAF…
- p. 143 …Lockheed mechanics
had mounted the various RAINBOW devices on the prototype U-2, a
Lockheed test…
- p. 144 …Unable to restart the power plant, Lockheed test pilot
Robert Sicker bailed out but was struck…
- p. 145 …The loss of one of Lockheed's best test pilots, as well as the pro-
totype…
- p. 157 …As a substitute,
Lockheed began working to develop a paint with radar-suppressant
qualities, but this…
- p. 162 …a series of tests over Edwards AFB. Lockheed began coating
the 11-2s with a standard…
- p. 188 …Although it haL refurbished by
Lockheed and now had the more powerful 175 engine that would…
- p. 200 …Beschloss claims that Powers was fired by Lockheed
for criticizing the Agency in his memoirs (which…
- p. 209 …Some poetic justice in this.'
One week later Colonel Geary called to order Lockheed to up…
- p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that
they could be refueled in…
- p. 220 …story, which
was that its pilots were Lockheed employees on a ferry flight to
Puerto Rico…
- p. 230 …CO5653421 UNCLASSIFIED
Chapter 5
Late in 1958, Lockheed began refitting the Agency's 13 remaining
U…
- p. 264 …1966 decided to place an order with Lockheed for ei g ht more aircraft
to be…
- p. 265 …Francis Gary Powers was one of the Lockheed test pilots who
checked out this new aircraft…
- p. 266 …began coming off the production line at Lockheed
in-the autumn of 1968, CIA and the…
- p. 273 …SP-1362, "History of the OXCART Program,"
Lockheed Aircraft Corporation, Burbank, CA. 1 July 1968, p…
- p. 275 …Personnel at Lockheed's Skunk Works referred to
these aircraft concepts as "Archangel-1," "Archangel-2…
- p. 276 RN
Chapter 6
263
Johnson, "Archangel log," 17-24
CO5653421 UNCLASSIFIED
Lockheed design for a hydrogen…
- p. 280 …During the first half of 1959, both Lockheed and Convair
worked to reduce the radar cross…
- p. 281 …In early June, Lockheed submitted a design for a ground-launched
aircraft known as the A…
E0 12958 1.6(dll11>1010101045Yrs
(SI The first Agency U-2 detachment, consisting of ircraft and
pilots, was known publicly as the 1st Weather xeconnaissance
Squadron, Provisional (WRSP-1). The "provisional" designation
gave the U-2 detachments greater security because provisional Air
Force units did not have to report to higher headquarters. WRSP-1,
known within the Agency as Detachment A, began deploying
)n 29 April 1956. By 4 May. all of the detachment s
, personnel and equipment, including aircraft, had arrived at
Shortly after deployment, on 7 May, the National Advisory
Committee on Aeronautics (NACA) released an unclassified U-2
cover story stating that a Lockheed-developed aircraft would be flown
by the USAF Air Weather Service to study such high-altitude phenom-
ena as the jet stream, convective clouds, temperature and wind struc-
tures at jet-stream levels, and cosmic-ray effects up to 55,000 feet.'
Ibid.. pp. 17-18 (TS Codeword).
Press Release of 7 May 1956 (U) in OSA History, chap. 7. annex 60 (TS Codeword).
UNCLASSIFIED