Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by GLM-OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 22 …Air Force headquarters soon approved Martin's proposal to modify the B-57 and was very…
  • p. 31 …Their headquarters was located over a secretarial school on Beacon Hill, which soon became the codename…
  • p. 55 Secret NOFORN Chapter 2 42 The Matomic Building total of 357 personnel divided among project headquarters…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 85 …Frequent flights were also necessary to bring in supplies and visitors from contractors and headquarters. Therefore…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 128 …Lundahl and Reber flew from the United Kingdom to US Air Force Europe headquarters in Wiesbaden…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 191 …commander at Adana, to Air Force Europe headquarters, to replace the cover story that had been…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 233 …On 6 June 1960, project headquarters decided on a phased-out withdrawal of Detachment C between…
  • p. 235 …Airport, the pilot reported the incident to Headquarters. The Office of Security immediately contacted the Pennsylvania…
  • p. 312 …Project headquarters therefore began preparing contingency plans (Project SKYLARK) for the possible employment of OXCART over…
  • p. 319 …To ensure secure communications between Headquarters and Kadena. A typical mission over North Vietnam required refueling…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A-12s would…
  • p. 324 …President Johnson confirmed this decision on 21 May. $ ^{69} $ Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the reconnaissance program, from project headquarters to the…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…

Read from the scan by GLM-OCR; expect the odd misread word.

Secret NOFORN
Chapter 2

LeVier made an additional 19 flights in article 341 before moving on to other Lockheed flight test programs in early September. This first phase of U-2 testing explored the craft's stall envelope, took the aircraft to its maximum stress limit (2.5 g's), and explored its speed potential. LeVier soon flew the aircraft at its maximum speed of Mach 0.85. Flight tests continued, with the U-2 ascending to altitudes never before attained in sustained flight. On 16 August LeVier took the aircraft up to 52,000 feet. In preparation for this flight, the 42-year-old test pilot completed the Air Force partial-pressure suit training program, becoming the oldest pilot to do so. Testing at even higher altitudes continued, and on 8 September the U-2 reached its initial design altitude of 65,600 feet. $ ^{45} $

On 22 September 1955, the U-2 experienced its first flameout at 64,000 feet—more than 12 miles up. After a brief restart, the J57/ P-37 engine again flamed out at 60,000 feet, and the aircraft descended to 35,000 feet before the engine could be relit. Engineers from Pratt & Whitney immediately set to work on this problem. The P-37 model engine had significantly poorer combustion characteristics than the preferred but unavailable P-31 version and therefore tended to flame out at high altitudes. Combustion problems usually became apparent as the U-2 began the final part of its climb from 57,000 to 65,000 feet, causing pilots to refer to this area as the "badlands" or the "chimney." Flameouts bedeviled the U-2 project until sufficient numbers of the more powerful P-31 engines became available in the spring of 1956. $ ^{46} $

Meanwhile, with the airworthiness of the U-2 airframe proven, Lockheed set up a production line in the Skunk Works, but delivery of even the second-choice J57/P-37 engines became a major problem. Pratt & Whitney's full production capacity for these engines for the next year was contracted to the Air Force for use in F-100 fighters and KC-135 tankers. Colonel Geary, with the help of a colleague in the Air Force Materiel Command, managed to arrange the diversion of a number of these engines from a shipment destined for Boeing's KC-135 production line, making it possible to continue building the U-2s. $ ^{47} $

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.