“Mission Control”28 pages
- p. 9 …The struggle between the CIA and the US Air Force to control the U-2 and…
- p. 72 …2 missions. Access to the photographs taken by the U-2 would be strictly controlled, which…
- p. 73 …This pact gave the Air Force responsibility for pilot selection and training, weather information, mission plotting…
- p. 81 …Before the start of a mission, the ground crew set the counters to indicate the total…
- p. 96 …All of the products from this project would be placed in the new control system. By…
- p. 100 …This was an S-band radar used by Soviet forces for early warning and ground-controlled…
- p. 113 …The President nevertheless maintained tight control over the program and authorized only 10 days of overflights…
- p. 128 …personnel controlling overseas photo processing and interpretation centers, which were normally under Air Force control. Further…
- p. 140 …Although the President would not allow U-2s to fly their primary mission of reconnaissance of…
- p. 142 …of the first series of U-2 missions. The CIA proprietary firm Scientific Engineering Institute was…
- p. 147 …To take advantage of these weaknesses, Detachment C staged three missions from Alaska into the Soviet…
- p. 156 …After these missions, penetration overflights became a rarity. There would be only six more during the…
- p. 167 …U-2 missions. To handle U-2 material, the British created a new control system, which…
- p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
- p. 169 …of authority for the joint program: "British missions are carried out on your authority and are…
- p. 170 Secret NOFORN
Chapter 3
May 1959, and used to fly weather missions on 7 and 8…
- p. 180 …As in December, the pilot was British, and the mission had been ordered by Prime Minister…
- p. 188 …some Soviet airborne-missile fire-control systems.
Operation GRAND SLAM, mission 4154 and the 24th deep…
- p. 191 …This revised cover story, along with a mission flight plan consistent with it, was sent to…
- p. 193 …the impression that he was not in control of his administration. On Wednesday, 11 May, the…
- p. 196 …with Abel's "wife" (probably his Soviet control) in East Germany. In November 1961, Acting DCI…
- p. 204 …in the DDP in order to maintain control of his overhead reconnaissance projects (the U-2…
- p. 220 …Strongly favoring Air Force control of the U-2 missions over Cuba, the DOD representatives called…
- p. 237 …In reality, however, the United States would maintain strict control over the missions to be flown…
- p. 335 …The flood of information that the U-2 missions gathered led to a major expansion of…
- p. 340 …In 1959 Bissell became Deputy Director for Plans but kept the reconnaissance projects under his control…
- p. 348 …System-I used S- and X-band ELINT receivers to collect ground-controlled intercept and air…
- p. 400 mission 2023
108
mission 2029
124
mission 3086
200
mission 3088
200
mission 3089
201
mission…
Read from the scan by GLM-OCR; expect the odd misread word.
Secret NOFORN
Chapter 2
54
operating time. Three of the seven B-camera frames provided stereo coverage. The complex B cameras were engineered by Hycon's chief designer, William McFadden. $ ^{19} $
James Baker's idea for the ultimate high-altitude camera was the C model that would have a 240-inch focal length. In December 1954, he made preliminary designs for folding the optical path using three mirrors, a prism, and an f/20.0 lens system. Before working out the details of this design, however, Baker flew to California in early January 1955 to consult with Kelly Johnson about the weight and space limitations of the U-2's payload compartment. Despite every effort to reduce the physical dimensions of the C camera, Baker needed an additional six inches of payload space to accommodate the bigger lens. When he broached this subject to Johnson, the latter replied, "Six more inches? I'd sell my grandmother for six more inches!" $ ^{20} $