This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 58 …in Lockheed's Advanced Development facility at Burbank, California, known as the Skunk Works. $ ^{10} $ Lockheed…
  • p. 85 …how to transfer Lockheed employees from Burbank to Area 51 without arousing a great deal of…
  • p. 287 …designed trailer truck that carried it from Burbank to Area 51. By 18 November 1959, the…
  • p. 296 …not test the OXCART aircraft at its Burbank facility, where the runway was too short and…
  • p. 297 …Construction began in September 1960; a C-47 shuttle service ferried work crews from Burbank to…
  • p. 299 …The plane left Burbank on 26 February 1962 and arrived at Area 51 two days later…
  • p. 304 …into the engine nacelles during assembly at Burbank were sucked into the power plant during initial…
  • p. 372 …201,205,209,236,293 BUORL 22 Burbank, California 45 Secret NOFORN Burke, William 168,170…

Read from the scan by GLM-OCR; expect the odd misread word.

Secret NOFORN
Chapter 2
46

Skunk Works Design Staff

speed of Mach 0.8 or 460 knots at altitude. Its initial maximum altitude would be 70,600 feet and the ultimate maximum altitude would be 73,100 feet. According to these early December 1954 specifications, the new plane would take off at 90 knots, land at 76 knots, and be able to glide 244 nautical miles from an altitude of 70,000 feet. After discussing the reconnaissance bay with James Baker, Johnson had worked out various equipment combinations that would not exceed the weight limit of 450 pounds. Johnson ended his report by promising the first test flight by 2 August 1955 and the completion of four aircraft by 1 December 1955. $ ^{12} $

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.