Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 11 …At great risk, US Air Force and Navy aircraft had been conducting peripheral reconnaissance and shallow…
  • p. 16 …As a result, in the late 1940s, the US Air Force and Navy began trying to…
  • p. 17 …Two months later, on 7 October 1952, Soviet fighter aircraft stalked and shot down a US…
  • p. 72 On 29 April 1955, Richard Bissell signed an agreement with the Air Force and the Navy…
  • p. 94 …The committee issued its list of targets for the use of the entire intelligence community using…
  • p. 147 …The Agency then turned to the Navy, which granted permission for Detachment C to use the…
  • p. 180 …James Doolittle urged President Eisenhower to use overflights of the Soviet Union to the maximum degree…
  • p. 223 …returned by Air Force and Navy reconnaissance aircraft. President Kennedy used NPIC photographs to illustrate his…
  • p. 273 …Charyk, and his Navy counterpart, Garrison Norton. Designers from several aircraft manufacturers also attended some of…
  • p. 283 …This engine had originally been developed for the Navy's large, jet-powered flying boat, the…
  • p. 297 …The need for additional buildings on the base was met by the Navy. Three surplus Navy…
  • p. 298 …After hearing Bissell and Holcomb's suggestion that the J58 might be used in future Navy…
  • p. 348 …Following modifications to make System-VII suitable for use by the Navy, the designation was changed…
  • p. 353 …AQUILINE prototype at Randsburg Wash on the US Navy's Naval Ordnance Test Station at China…
  • p. 401 …328 US Marine Corps Reserve 14 US Military Academy at West Point 329 US Navy Chief…
Secret NOFORN
Chapter 2
44

use. Public Law 110, approved by the 81st Congress on 20 June 1949, designates the Director of Central Intelligence as the only government employee who can obligate Federal money without the use of vouchers. By using unvouchered funds, it is possible to eliminate competitive bidding and thereby limit the number of parties who know about a given project. The use of unvouchered funds also speeds up the Federal procurement cycle. A general contractor such as Lockheed can purchase much, if not all, of the supplies needed for a project without resorting at each step to the mandated procurement procedures involving public, competitive bidding.

In mid-December 1954, President Eisenhower authorized DCI Dulles to use $35 million from the Agency's Contingency Reserve Fund to finance the U-2 project. Then on 22 December 1954, the Agency signed a letter contract with Lockheed, using the codename Project OARFISH. The Agency had proposed to give Lockheed "performance specifications" rather than the standard Air Force "technical specifications," which were more rigid and demanding, and Kelly Johnson agreed that such a move would save a lot of money. Lockheed's original proposal to the Air Force in May 1954 had been $28 million for 20 U-2s equipped with GE J73 engines. During negotiations with CIA General Counsel Lawrence R. Houston, Lockheed changed its proposal to $26 million for 20 airframes plus a two-seat trainer model and spares; the Air Force was to furnish the engines. Houston insisted that the Agency could only budget $22.5 million for the airframes because it needed the balance of the available $35 million for cameras and life-support gear. The two sides finally agreed on a fixed-price contract with a provision for a review three-fourths of the way through to determine if the costs were going to exceed the $22.5 million figure. The formal contract, No. SP-1913, was signed on 2 March 1955 and called for the delivery of the first U-2 in July 1955 and the last in November 1956. Meanwhile, to keep work moving at Lockheed, Richard Bissell wrote a check for $1,256,000 and mailed it to Kelly Johnson's home on 21 February 1955.

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.