Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to altitudes never before attained in sustained flight…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover remained…
  • p. 138 …William Shelton, raised an important question that had never been considered: what would happen if an…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 157 …2 flight over the Black Sea that never violated Soviet airspace revealed 12 attempts at interception…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its original U-2s with the J75 engines. $ ^{106} $ Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 194 …2 program in 1974, but RAF pilots never again conducted an overflight in an Agency U…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on 1 May 1960 proved to be the…
  • p. 223 …Responsibility for photographic coverage of Cuba remained with the Air Force; Agency pilots never flew another…
  • p. 227 …Both were experienced with World War II aircraft, although Vito had never flown the rebels' fighter…
  • p. 248 …It was short of both pilots and planes and never had more than three U-2s…
  • p. 257 …This was an electronic intelligence mission that, in accordance with the new guidelines, never came closer…
  • p. 264 Secret NOFORN Chapter 5 There was never another Agency U-2 mission from an aircraft carrier…
  • p. 290 …the OXCART aircraft for its own use, never adopted the laminated vertical stabilizers. $ ^{18} $ ## THE OXCART…
  • p. 294 …Scott employed concepts never before used in camera systems. These included the use of a reflecting…
  • p. 298 …above water. $ ^{29}$ As it turned out, the J58 was never used in a Navy aircraft.
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 303 …the J58 had to reach performance levels never before achieved by a jet engine, while operating…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and lockon modes, a fact that…
  • p. 317 …strongly opposed it and the 303 Committee never forwarded the proposal to President Johnson. $ ^{59} $ The…
  • p. 318 …The OXCART, which had never operated in heavy rain, taxied to the runway and took off…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …in 1962, its speed and altitude have never been equaled. The development of this aircraft also…
  • p. 348 …System-II, a communications and navigation system, never worked properly and was canceled. System-III, a…
  • p. 349 …a mission over the Soviet Union that never took place. Systems-XI through XV were ECM…
Secret NOFORN
Chapter 1
34

The letter had two attachments: a two-page summary of a complete operational plan for organizing, building, and deploying the CL-282 within a period of 20 months at a cost of $22 million and a three-page memorandum, entitled "A Unique Opportunity for Comprehensive Intelligence."

We believe that these planes can go where we need to have them go efficiently and safely, and that no amount of fragmentary and indirect intelligence can be pieced together to be equivalent to such positive information as can thus be provided. $ ^{60} $

Aware of Dulles's preference for classical intelligence work, the Project Three memorandum stressed the superiority of the CL-282 program over traditional espionage methods:

The Land committee memorandum also stressed the need for the CIA to undertake such reconnaissance missions rather than the Air Force, noting that "For the present it seems rather dangerous for one of our military arms to engage directly in extensive overflight." The committee members also listed the advantages of using the CL-282 rather than an Air Force aircraft:

The Lockheed super glider will fly at 70,000 feet, well out of the reach of present Russian interceptors and high enough to have a good chance of avoiding detection. The plane itself is so light (15,000 pounds), so obviously unarmed and devoid of military usefulness, that it would minimize affront to the Russians even if through some remote mischance it were detected and identified. $ ^{61} $

One additional advantage of the Lockheed design over the Air Force's proposed high-altitude reconnaissance aircraft was a faster completion time. Kelly Johnson had promised the Land committee that his aircraft would be flying by August 1955, just eight months after he proposed to start construction. The Bell X-16 prototype was not scheduled for completion before the spring of 1956.

The strong advocacy of Killian and the other scientists on the various advisory committees concerned with overhead reconnaissance, combined with President Eisenhower's support, finally won

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.