Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 9 …The struggle between the CIA and the US Air Force to control the U-2 and…
  • p. 72 …2 missions. Access to the photographs taken by the U-2 would be strictly controlled, which…
  • p. 73 …This pact gave the Air Force responsibility for pilot selection and training, weather information, mission plotting…
  • p. 81 …Before the start of a mission, the ground crew set the counters to indicate the total…
  • p. 96 …All of the products from this project would be placed in the new control system. By…
  • p. 100 …This was an S-band radar used by Soviet forces for early warning and ground-controlled…
  • p. 113 …The President nevertheless maintained tight control over the program and authorized only 10 days of overflights…
  • p. 128 …personnel controlling overseas photo processing and interpretation centers, which were normally under Air Force control. Further…
  • p. 140 …Although the President would not allow U-2s to fly their primary mission of reconnaissance of…
  • p. 142 …of the first series of U-2 missions. The CIA proprietary firm Scientific Engineering Institute was…
  • p. 147 …To take advantage of these weaknesses, Detachment C staged three missions from Alaska into the Soviet…
  • p. 156 …After these missions, penetration overflights became a rarity. There would be only six more during the…
  • p. 167 …U-2 missions. To handle U-2 material, the British created a new control system, which…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 169 …of authority for the joint program: "British missions are carried out on your authority and are…
  • p. 170 Secret NOFORN Chapter 3 May 1959, and used to fly weather missions on 7 and 8…
  • p. 180 …As in December, the pilot was British, and the mission had been ordered by Prime Minister…
  • p. 188 …some Soviet airborne-missile fire-control systems. Operation GRAND SLAM, mission 4154 and the 24th deep…
  • p. 191 …This revised cover story, along with a mission flight plan consistent with it, was sent to…
  • p. 193 …the impression that he was not in control of his administration. On Wednesday, 11 May, the…
  • p. 196 …with Abel's "wife" (probably his Soviet control) in East Germany. In November 1961, Acting DCI…
  • p. 204 …in the DDP in order to maintain control of his overhead reconnaissance projects (the U-2…
  • p. 220 …Strongly favoring Air Force control of the U-2 missions over Cuba, the DOD representatives called…
  • p. 237 …In reality, however, the United States would maintain strict control over the missions to be flown…
  • p. 335 …The flood of information that the U-2 missions gathered led to a major expansion of…
  • p. 340 …In 1959 Bissell became Deputy Director for Plans but kept the reconnaissance projects under his control…
  • p. 348 …System-I used S- and X-band ELINT receivers to collect ground-controlled intercept and air…
  • p. 400 mission 2023 108 mission 2029 124 mission 3086 200 mission 3088 200 mission 3089 201 mission…
decided to go to Nevada and take charge of the OXCART's development himself. His presence made a big difference, as can be seen in his notes in the project log:

I uncovered many items of a managerial, materiel and design nature... I had meetings with vendors to improve their operation... Changed supervision and had daily talks with them, going over in detail all problems on the aircraft... Increased the supervision in the electrical group by 500%... We tightened up the inspection procedures a great deal and made inspection stick.

These improvements in on-site management got the project back on schedule.

It appears that the problems are one-third due to bum engineering... The addition of so many systems to the A-12 has greatly complicated the problems, but we did solve the overall problem. $ ^{48} $

By 20 November 1965, the final validation flights for OXCART deployment were finished. During these tests, the OXCART achieved a maximum speed of Mach 3.29, an altitude of 90,000 feet, and sustained flight time above Mach 3.2 of 74 minutes. The maximum endurance test lasted six hours and 20 minutes. On 22 November, Kelly Johnson wrote to Brig. Gen. Jack C. Ledford, head of the Office of Special Activities, stating, "The time has come when the bird should leave its nest." 49

## DISCUSSIONS ON THE OXCART'S FUTURE EMPLOYMENT

Three years and seven months after its first flight in April 1962, the OXCART was ready for operational use. It was now time to find work for the most advanced aircraft ever conceived and built.

Although the OXCART had been designed to replace the U-2 as a strategic reconnaissance aircraft to fly over the Soviet Union, this use had become doubtful long before the OXCART was ready for operational use. The U-2 Affair of 1960 made Presidents very reluctant to consider overflights of the Soviet Union. Indeed, Presidents Eisenhower and Kennedy had both stated publicly that the United States would not conduct such overflights. In July 1962, Secretary of

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.