This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 19 Secret NOFORN Chapter 1 6 RAF Canberra Mark-PR3 division in Baltimore, headed by Lt. Col…
  • p. 36 …In 1952 the Royal Air Force (RAF) began Project ROBIN, which was designed to modify the…
  • p. 106 …The U-2s were to use Lakenheath AFB, an RAF base also used by the USAF…
  • p. 107 …inadvertently penetrated the British radar network, causing RAF fighters to scramble. Afterward the Air Ministry made…
  • p. 122 …twin-engine Canberra bomber, similar to the RAF overflight of Kapustin Yar in 1953. The US…
  • p. 156 …Range for the first time since the RAF's overflight in 1953, obtaining photographs of a…
  • p. 166 …In November 1958, four RAF officers arrived at Detachment B at Adana, thus beginning the United…
  • p. 167 …On 7 February 1958, Bissell instructed the to ask Air Vice Marshal MacDonald if the RAF…
  • p. 168 …MacDonald agreed to Bissell's proposal and began recruiting RAF pilots to fly the U-2…
  • p. 169 …Most flights by the RAF pilots in Detachment B, however, took place in the Middle East…
  • p. 177 …For almost a year, the RAF pilots of Detachment B had been ready to fly over…
  • p. 194 …A four-man unit of RAF U-2 pilots was stationed at Detachment G, Edwards AFB…
  • p. 200 …approval authority for missions conducted by the RAF pilots in Detachment B. The loss of Powers…
  • p. 316 …Project IDEALIST U-2 flying from an RAF facility in Great Britain. The OXCART would fly…
  • p. 332 …1960, the need for British participation lessened. RAF pilots henceforth flew only training or ferry missions…
  • p. 339 …Division PSAC President's Science Advisory Committee RAF Royal Air Force RFP Request for proposal SAB…
  • p. 351 …May 1960 4154 Powers Peshawar B B Tyuratam, Kyshtym, Sverdlovsk; downed by SAM $ ^{a} $ RAF pilot
  • p. 402 …Louis 29 Watertown Strip 57 Watton RAF Base. England 156 "weather plane" cover story 179 weather…
Secret NOFORN
Chapter 6
296

Two more A-12s were lost in later testing. On 9 July 1964, article 133 crashed while landing when a pitch-control servo device froze, rolling the plane into a wing-down position. Ejecting from an altitude of 120 feet, the pilot was blown sideways out of the craft. Although he was not very high off the ground, his parachute did open and he landed during the parachute's first swing. Fortunately he was unhurt, and no news of the accident filtered out of the base. Eighteen months later, on 28 December 1965, article 126 crashed immediately after takeoff because of an improperly wired stability augmentation system. As in the previous crash, the pilot ejected safely, and there was no publicity connected with the crash. An investigation ordered by DCI McCone determined that the wiring error had resulted from negligence, not sabotage. $ ^{46} $

The A-12 made its first long-range, high-speed flight on 27 January 1965. The flight lasted 100 minutes, 75 minutes of which were flown at speeds greater than Mach 3.1, and the aircraft covered 2,580 miles at altitudes between 75,600 and 80,000 feet. By this time, the OXCART was performing well. The engine inlet, camera, hydraulic, navigation, and flight-control systems all demonstrated acceptable reliability.

Nevertheless, as the OXCART began flying longer, faster, and higher, new problems arose. The most serious of these problems involved the aircraft's wiring. Continuing malfunctions of the inlet controls, communications equipment, ECM systems, and cockpit instruments were often attributable to wiring failures. Wiring connectors and components had to withstand temperatures above $ 8 0 0 ^{\circ} \mathrm{F} $ structural flexing, vibration, and shock. Such demands were more than the materials could stand. Not all of the OXCART's problems could be traced to materiel failures, however, and Agency officials believed that careless maintenance by Lockheed employees also contributed to malfunctions. $ ^{47} $

Concerned that Lockheed would not be able to meet the OXCART's schedule for operational readiness, the Office of Special Activities' Director of Technology, John Parangosky, met with Kelly Johnson on 3 August 1965 to discuss the project's problems. Johnson not only assigned more top-level supervisors to the project but also