Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to altitudes never before attained in sustained flight…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover remained…
  • p. 138 …William Shelton, raised an important question that had never been considered: what would happen if an…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 157 …2 flight over the Black Sea that never violated Soviet airspace revealed 12 attempts at interception…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its original U-2s with the J75 engines. $ ^{106} $ Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 194 …2 program in 1974, but RAF pilots never again conducted an overflight in an Agency U…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on 1 May 1960 proved to be the…
  • p. 223 …Responsibility for photographic coverage of Cuba remained with the Air Force; Agency pilots never flew another…
  • p. 227 …Both were experienced with World War II aircraft, although Vito had never flown the rebels' fighter…
  • p. 248 …It was short of both pilots and planes and never had more than three U-2s…
  • p. 257 …This was an electronic intelligence mission that, in accordance with the new guidelines, never came closer…
  • p. 264 Secret NOFORN Chapter 5 There was never another Agency U-2 mission from an aircraft carrier…
  • p. 290 …the OXCART aircraft for its own use, never adopted the laminated vertical stabilizers. $ ^{18} $ ## THE OXCART…
  • p. 294 …Scott employed concepts never before used in camera systems. These included the use of a reflecting…
  • p. 298 …above water. $ ^{29}$ As it turned out, the J58 was never used in a Navy aircraft.
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 303 …the J58 had to reach performance levels never before achieved by a jet engine, while operating…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and lockon modes, a fact that…
  • p. 317 …strongly opposed it and the 303 Committee never forwarded the proposal to President Johnson. $ ^{59} $ The…
  • p. 318 …The OXCART, which had never operated in heavy rain, taxied to the runway and took off…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …in 1962, its speed and altitude have never been equaled. The development of this aircraft also…
  • p. 348 …System-II, a communications and navigation system, never worked properly and was canceled. System-III, a…
  • p. 349 …a mission over the Soviet Union that never took place. Systems-XI through XV were ECM…
Secret NOFORN
Chapter 6
296

Two more A-12s were lost in later testing. On 9 July 1964, article 133 crashed while landing when a pitch-control servo device froze, rolling the plane into a wing-down position. Ejecting from an altitude of 120 feet, the pilot was blown sideways out of the craft. Although he was not very high off the ground, his parachute did open and he landed during the parachute's first swing. Fortunately he was unhurt, and no news of the accident filtered out of the base. Eighteen months later, on 28 December 1965, article 126 crashed immediately after takeoff because of an improperly wired stability augmentation system. As in the previous crash, the pilot ejected safely, and there was no publicity connected with the crash. An investigation ordered by DCI McCone determined that the wiring error had resulted from negligence, not sabotage. $ ^{46} $

The A-12 made its first long-range, high-speed flight on 27 January 1965. The flight lasted 100 minutes, 75 minutes of which were flown at speeds greater than Mach 3.1, and the aircraft covered 2,580 miles at altitudes between 75,600 and 80,000 feet. By this time, the OXCART was performing well. The engine inlet, camera, hydraulic, navigation, and flight-control systems all demonstrated acceptable reliability.

Nevertheless, as the OXCART began flying longer, faster, and higher, new problems arose. The most serious of these problems involved the aircraft's wiring. Continuing malfunctions of the inlet controls, communications equipment, ECM systems, and cockpit instruments were often attributable to wiring failures. Wiring connectors and components had to withstand temperatures above $ 8 0 0 ^{\circ} \mathrm{F} $ structural flexing, vibration, and shock. Such demands were more than the materials could stand. Not all of the OXCART's problems could be traced to materiel failures, however, and Agency officials believed that careless maintenance by Lockheed employees also contributed to malfunctions. $ ^{47} $

Concerned that Lockheed would not be able to meet the OXCART's schedule for operational readiness, the Office of Special Activities' Director of Technology, John Parangosky, met with Kelly Johnson on 3 August 1965 to discuss the project's problems. Johnson not only assigned more top-level supervisors to the project but also

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.