The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 4 …17 The BEACON HILL Report... 17 Concern About the Danger of a Soviet Surprise Attack... 19…
  • p. 13 Helen Hill Kleyla and Robert D. O'Hern. This 16-volume Top Secret Codeword study of…
  • p. 14 …view of the "other side of the hill." With the advent of dry film, it became…
  • p. 30 …this new advisory body. $ ^{29} $ ## The BEACON HILL Report In 1951 the Air Force sought even…
  • p. 31 …Their headquarters was located over a secretarial school on Beacon Hill, which soon became the codename…
  • p. 32 Secret NOFORN Chapter 1 document on 15 June 1952, the BEACON HILL Report advocated radical approaches…
  • p. 34 …Created in July 1953, the Intelligence Systems Panel (ISP) included several experts from the BEACON HILL…
  • p. 37 …the reconnaissance needs expressed in the BEACON HILL Report. Theoretically, he explained to the panel, any…
  • p. 44 …members had been discussing since the BEACON HILL and Intelligence Systems Panel meetings. James Baker was…
  • p. 45 …Having participated in the BEACON HILL Study and the Intelligence Systems Panel, several Project Three members…
  • p. 344 …He headed the Beacon Hill Panel in 1952 and later became director of Lincoln Laboratories. ## PARANGOSKY…
  • p. 345 …of several advisory panels, including the BEACON HILL project. He helped Baker decide what cameras to…
  • p. 364 …BEACON HILL Report: Problems of Air Force Intelligence and Reconnaissance. Massachusetts Institute of Technology, 15 June…
  • p. 371 …137 Beacon Hill 17-19,21,24,31-32,331-332 BEACON HILL Report 17,19…
Secret NOFORN
Chapter 6
296

Two more A-12s were lost in later testing. On 9 July 1964, article 133 crashed while landing when a pitch-control servo device froze, rolling the plane into a wing-down position. Ejecting from an altitude of 120 feet, the pilot was blown sideways out of the craft. Although he was not very high off the ground, his parachute did open and he landed during the parachute's first swing. Fortunately he was unhurt, and no news of the accident filtered out of the base. Eighteen months later, on 28 December 1965, article 126 crashed immediately after takeoff because of an improperly wired stability augmentation system. As in the previous crash, the pilot ejected safely, and there was no publicity connected with the crash. An investigation ordered by DCI McCone determined that the wiring error had resulted from negligence, not sabotage. $ ^{46} $

The A-12 made its first long-range, high-speed flight on 27 January 1965. The flight lasted 100 minutes, 75 minutes of which were flown at speeds greater than Mach 3.1, and the aircraft covered 2,580 miles at altitudes between 75,600 and 80,000 feet. By this time, the OXCART was performing well. The engine inlet, camera, hydraulic, navigation, and flight-control systems all demonstrated acceptable reliability.

Nevertheless, as the OXCART began flying longer, faster, and higher, new problems arose. The most serious of these problems involved the aircraft's wiring. Continuing malfunctions of the inlet controls, communications equipment, ECM systems, and cockpit instruments were often attributable to wiring failures. Wiring connectors and components had to withstand temperatures above $ 8 0 0 ^{\circ} \mathrm{F} $ structural flexing, vibration, and shock. Such demands were more than the materials could stand. Not all of the OXCART's problems could be traced to materiel failures, however, and Agency officials believed that careless maintenance by Lockheed employees also contributed to malfunctions. $ ^{47} $

Concerned that Lockheed would not be able to meet the OXCART's schedule for operational readiness, the Office of Special Activities' Director of Technology, John Parangosky, met with Kelly Johnson on 3 August 1965 to discuss the project's problems. Johnson not only assigned more top-level supervisors to the project but also