Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by GLM-OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 123 …Former Air Force Col. Richard S. Leghorn headed the SEI operation for the Agency when it…
  • p. 146 …U-2 took off from Eielson Air Force Base in Alaska to conduct the first intentional…
  • p. 195 …were consolidated into Detachment G at Edwards Air Force Base, California, the unit formed after the…
  • p. 222 …CIA's U-2 Detachment at Edwards Air Force Base on 11 October, and the CIA…
  • p. 234 …were incorporated into Detachment G at Edwards Air Force Base in California. This detachment was now…
  • p. 269 …the Agency's Detachment G at Edwards Air Force Base could deploy aircraft to and begin…
  • p. 308 Secret NOFORN Chapter 6 these aircraft were hastily flown to Edwards Air Force Base. From this…

Read from the scan by GLM-OCR; expect the odd misread word.

Secret NOFORN

Chapter 6

First flight of the A-12, 30 April 1962

Initial testing could not explore the A-12's maximum potential, since the J58 engine was still not ready. Developing this power plant to OXCART specifications was proving much more difficult than had been expected because the J58 had to reach performance levels never before achieved by a jet engine, while operating under extremely difficult environmental conditions. To simulate the stress that the J58 would undergo during maximum power output (Mach 3.2 at 97,000 feet), the power plant was tested in the exhaust stream of a J75 engine. In the course of this extremely severe testing, the J58's problems were gradually overcome. By January 1963, Pratt & Whitney had delivered 10 J58 engines to the Nevada testing site. The first flight of an A-12 with two J58 engines took place on 15 January 1963. $ ^{34} $

## SPEED-RELATED PROBLEMS

As J58-equipped A-12s reached higher and higher speeds, more difficulties arose. Major problems developed at speeds between Mach 2.4 and 2.8 because the aircraft's shock wave interfered with the flow of air into the engine, greatly reducing its performance. Solving this problem required long and often highly frustrating experimentation

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.