Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 16 …An RB-29 lost in the Sea of Japan on 13 June 1952 was probably also…
  • p. 38 …off to about 6 percent of its sea-level thrust. Finally, low structural load factors, like…
  • p. 75 …3 0 0 ^{\circ} \mathrm{F} $ at sea level. Manufacturing this special fuel required petroleum byproducts…
  • p. 80 …276 pounds heavier and delivered only 10,200 pounds of thrust at sea level; the resulting
  • p. 89 …that they could not be flown at sea level faster than 190 knots in smooth air…
  • p. 98 …southern Europe and then across the Black Sea and the desert areas of China. These balloons…
  • p. 139 …Soviet border from the Black Sea to the Caspian Sea and on to Afghanistan. The System…
  • p. 146 …On 31 July, the same aircraft made a run over the Black Sea. There were a…
  • p. 148 …space launch facility east of the Aral Sea in Kazakhstan. None of the mission planners was…
  • p. 153 …of Soviet naval maneuvers in the Barents Sea. The final overflight of Detachment A. mission 2040…
  • p. 157 Secret NOFORN Chapter 3 144 U-2s flying well within international airspace above the Black Sea…
  • p. 158 …it turned abruptly upward over the Bering Sea just west of Alaska, climbed to 110,000…
  • p. 166 …the Soviet border and over the Black Sea without entering Soviet airspace. In late August, as…
  • p. 185 …Because the Bodo airfield was involved in NATO maneuvers taking place in the Barents Sea area…
  • p. 225 …forces were conducting an all-out air-sea-land drive against the rebel-held areas in…
  • p. 257 …The use of peripheral missions prevented any further losses, although one aircraft crashed into the sea…
  • p. 316 …Shortly before Leningrad, the A-12 would head west-southwest down the Baltic Sea, skirting the…
  • p. 317 …2 would be flying farther out to sea, safely beyond the range of all Soviet SAMs…
  • p. 350 …B B Afghanistan, Tashkent, Tyuratam, Kazalinsk, Aral Sea 11 August 1957 4039 McMurray Lahore B B…
  • p. 351 …A-2 Dushanbe, Tashkent, Tyuratam, Kazalinsk, Aral Sea 10 September 1957 4059 Hall Adana B A…
  • p. 369 …AQUILINE 304, 339-343 Arabs 256 Aral Sea 135 Arbenz, Jacobo 16 "Archangel-1" 262 "Archangel…
  • p. 371 ## Secret NOFORN Index 358 Baltic Sea 3, 303 Baltic states 104 Baltimore; Maryland 6, 9 Barents…
  • p. 373 …186, 201, 205, 208-209, 299, 327 Caspian Sea 126 catheterized 64 cathode-ray tube 267…
  • p. 382 …23-24, 109, 139, 143, 164 Kara Sea 142 Kazakh language 135 Kazakhstan 135 Kazan', Soviet…
  • p. 385 …301 mechanical fuel totalizer/counters 68 Mediterranean Sea 114, 116, 121, 140, 142, 153 medium-range…
  • p. 393 …7 Scranton-Wilkes-Barre Airport, Pennsylvania 222 Sea of Japan 3 Seaberg, John 8-9, 12…
Secret NOFORN

Chapter 6

## DELIVERY OF THE FIRST OXCART

The first A-12, known as article 121, was assembled and tested at Burbank during January and February 1962. Since it could not be flown to the Nevada site, the aircraft had to be partially disassembled and put on a specially designed trailer that cost nearly $100,000. The entire fuselage, without the wings, was crated and covered, creating a load 35 feet wide and 105 feet long. To transport this huge load safely over the hundreds of miles to the site, obstructing road signs were removed, trees were trimmed, and some roadbanks had to be leveled. The plane left Burbank on 26 February 1962 and arrived at Area 51 two days later.

After the fuselage arrived in Nevada, its wings were attached and the J75 engines were installed, but the aircraft was still not ready to be tested. This new delay was caused by leaking fuel tanks, a problem that would never be solved completely. Because the A-12's high speeds heat the titanium airframe to more than $ 5 0 0 ^{\circ} \mathrm{F} $ , Lockheed designers had to make allowances for expansion. When the metal was cold, the expansion joints were at their widest. In the fuel tanks, these gaps were filled by pliable sealants, but the fuel for the A-12's engines acted as a strong reducing agent that softened the sealants, causing leaks. Thus, when fuel was first poured into the aircraft, 68 leaks developed. Lockheed technicians then stripped and replaced all the sealant, a tedious and time consuming procedure because the sealant required four curing cycles, each at a different temperature over a period of 30 to 54 hours. The engineers were never able to discover a sealant compound that was completely impervious to the jet fuel while remaining elastic enough to expand and contract sufficiently. The A-12's tanks continued to leak, so when it was fueled, it only received enough fuel to get airborne. The plane would then rendezvous with a tanker, top off its tanks, and immediately climb to operating altitude, causing the metal to expand and the leaks to stop. $ ^{30} $

## CHANGES IN THE PROJECT MANAGEMENT

Richard Bissell, whose concern for the viability of the U-2 in 1956 had led to the establishment of Project OXCART and who had directed its growth all along, was no longer in charge when the first

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.