Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 19 Secret NOFORN Chapter 1 6 RAF Canberra Mark-PR3 division in Baltimore, headed by Lt. Col…
  • p. 36 …In 1952 the Royal Air Force (RAF) began Project ROBIN, which was designed to modify the…
  • p. 106 …The U-2s were to use Lakenheath AFB, an RAF base also used by the USAF…
  • p. 107 …inadvertently penetrated the British radar network, causing RAF fighters to scramble. Afterward the Air Ministry made…
  • p. 122 …twin-engine Canberra bomber, similar to the RAF overflight of Kapustin Yar in 1953. The US…
  • p. 156 …Range for the first time since the RAF's overflight in 1953, obtaining photographs of a…
  • p. 166 …In November 1958, four RAF officers arrived at Detachment B at Adana, thus beginning the United…
  • p. 167 …On 7 February 1958, Bissell instructed the to ask Air Vice Marshal MacDonald if the RAF…
  • p. 168 …MacDonald agreed to Bissell's proposal and began recruiting RAF pilots to fly the U-2…
  • p. 169 …Most flights by the RAF pilots in Detachment B, however, took place in the Middle East…
  • p. 177 …For almost a year, the RAF pilots of Detachment B had been ready to fly over…
  • p. 194 …A four-man unit of RAF U-2 pilots was stationed at Detachment G, Edwards AFB…
  • p. 200 …approval authority for missions conducted by the RAF pilots in Detachment B. The loss of Powers…
  • p. 316 …Project IDEALIST U-2 flying from an RAF facility in Great Britain. The OXCART would fly…
  • p. 332 …1960, the need for British participation lessened. RAF pilots henceforth flew only training or ferry missions…
  • p. 339 …Division PSAC President's Science Advisory Committee RAF Royal Air Force RFP Request for proposal SAB…
  • p. 351 …May 1960 4154 Powers Peshawar B B Tyuratam, Kyshtym, Sverdlovsk; downed by SAM $ ^{a} $ RAF pilot
  • p. 402 …Louis 29 Watertown Strip 57 Watton RAF Base. England 156 "weather plane" cover story 179 weather…
Secret NOFORN

Chapter 6

## DELIVERY OF THE FIRST OXCART

The first A-12, known as article 121, was assembled and tested at Burbank during January and February 1962. Since it could not be flown to the Nevada site, the aircraft had to be partially disassembled and put on a specially designed trailer that cost nearly $100,000. The entire fuselage, without the wings, was crated and covered, creating a load 35 feet wide and 105 feet long. To transport this huge load safely over the hundreds of miles to the site, obstructing road signs were removed, trees were trimmed, and some roadbanks had to be leveled. The plane left Burbank on 26 February 1962 and arrived at Area 51 two days later.

After the fuselage arrived in Nevada, its wings were attached and the J75 engines were installed, but the aircraft was still not ready to be tested. This new delay was caused by leaking fuel tanks, a problem that would never be solved completely. Because the A-12's high speeds heat the titanium airframe to more than $ 5 0 0 ^{\circ} \mathrm{F} $ , Lockheed designers had to make allowances for expansion. When the metal was cold, the expansion joints were at their widest. In the fuel tanks, these gaps were filled by pliable sealants, but the fuel for the A-12's engines acted as a strong reducing agent that softened the sealants, causing leaks. Thus, when fuel was first poured into the aircraft, 68 leaks developed. Lockheed technicians then stripped and replaced all the sealant, a tedious and time consuming procedure because the sealant required four curing cycles, each at a different temperature over a period of 30 to 54 hours. The engineers were never able to discover a sealant compound that was completely impervious to the jet fuel while remaining elastic enough to expand and contract sufficiently. The A-12's tanks continued to leak, so when it was fueled, it only received enough fuel to get airborne. The plane would then rendezvous with a tanker, top off its tanks, and immediately climb to operating altitude, causing the metal to expand and the leaks to stop. $ ^{30} $

## CHANGES IN THE PROJECT MANAGEMENT

Richard Bissell, whose concern for the viability of the U-2 in 1956 had led to the establishment of Project OXCART and who had directed its growth all along, was no longer in charge when the first

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.