This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to altitudes never before attained in sustained flight…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover remained…
  • p. 138 …William Shelton, raised an important question that had never been considered: what would happen if an…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 157 …2 flight over the Black Sea that never violated Soviet airspace revealed 12 attempts at interception…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its original U-2s with the J75 engines. $ ^{106} $ Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 194 …2 program in 1974, but RAF pilots never again conducted an overflight in an Agency U…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on 1 May 1960 proved to be the…
  • p. 223 …Responsibility for photographic coverage of Cuba remained with the Air Force; Agency pilots never flew another…
  • p. 227 …Both were experienced with World War II aircraft, although Vito had never flown the rebels' fighter…
  • p. 248 …It was short of both pilots and planes and never had more than three U-2s…
  • p. 257 …This was an electronic intelligence mission that, in accordance with the new guidelines, never came closer…
  • p. 264 Secret NOFORN Chapter 5 There was never another Agency U-2 mission from an aircraft carrier…
  • p. 290 …the OXCART aircraft for its own use, never adopted the laminated vertical stabilizers. $ ^{18} $ ## THE OXCART…
  • p. 294 …Scott employed concepts never before used in camera systems. These included the use of a reflecting…
  • p. 298 …above water. $ ^{29}$ As it turned out, the J58 was never used in a Navy aircraft.
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 303 …the J58 had to reach performance levels never before achieved by a jet engine, while operating…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and lockon modes, a fact that…
  • p. 317 …strongly opposed it and the 303 Committee never forwarded the proposal to President Johnson. $ ^{59} $ The…
  • p. 318 …The OXCART, which had never operated in heavy rain, taxied to the runway and took off…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …in 1962, its speed and altitude have never been equaled. The development of this aircraft also…
  • p. 348 …System-II, a communications and navigation system, never worked properly and was canceled. System-III, a…
  • p. 349 …a mission over the Soviet Union that never took place. Systems-XI through XV were ECM…
Secret NOFORN

Chapter 6

## DELIVERY OF THE FIRST OXCART

The first A-12, known as article 121, was assembled and tested at Burbank during January and February 1962. Since it could not be flown to the Nevada site, the aircraft had to be partially disassembled and put on a specially designed trailer that cost nearly $100,000. The entire fuselage, without the wings, was crated and covered, creating a load 35 feet wide and 105 feet long. To transport this huge load safely over the hundreds of miles to the site, obstructing road signs were removed, trees were trimmed, and some roadbanks had to be leveled. The plane left Burbank on 26 February 1962 and arrived at Area 51 two days later.

After the fuselage arrived in Nevada, its wings were attached and the J75 engines were installed, but the aircraft was still not ready to be tested. This new delay was caused by leaking fuel tanks, a problem that would never be solved completely. Because the A-12's high speeds heat the titanium airframe to more than $ 5 0 0 ^{\circ} \mathrm{F} $ , Lockheed designers had to make allowances for expansion. When the metal was cold, the expansion joints were at their widest. In the fuel tanks, these gaps were filled by pliable sealants, but the fuel for the A-12's engines acted as a strong reducing agent that softened the sealants, causing leaks. Thus, when fuel was first poured into the aircraft, 68 leaks developed. Lockheed technicians then stripped and replaced all the sealant, a tedious and time consuming procedure because the sealant required four curing cycles, each at a different temperature over a period of 30 to 54 hours. The engineers were never able to discover a sealant compound that was completely impervious to the jet fuel while remaining elastic enough to expand and contract sufficiently. The A-12's tanks continued to leak, so when it was fueled, it only received enough fuel to get airborne. The plane would then rendezvous with a tanker, top off its tanks, and immediately climb to operating altitude, causing the metal to expand and the leaks to stop. $ ^{30} $

## CHANGES IN THE PROJECT MANAGEMENT

Richard Bissell, whose concern for the viability of the U-2 in 1956 had led to the establishment of Project OXCART and who had directed its growth all along, was no longer in charge when the first

Not linked to a story yet.