Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to altitudes never before attained in sustained flight…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover remained…
  • p. 138 …William Shelton, raised an important question that had never been considered: what would happen if an…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 157 …2 flight over the Black Sea that never violated Soviet airspace revealed 12 attempts at interception…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its original U-2s with the J75 engines. $ ^{106} $ Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 194 …2 program in 1974, but RAF pilots never again conducted an overflight in an Agency U…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on 1 May 1960 proved to be the…
  • p. 223 …Responsibility for photographic coverage of Cuba remained with the Air Force; Agency pilots never flew another…
  • p. 227 …Both were experienced with World War II aircraft, although Vito had never flown the rebels' fighter…
  • p. 248 …It was short of both pilots and planes and never had more than three U-2s…
  • p. 257 …This was an electronic intelligence mission that, in accordance with the new guidelines, never came closer…
  • p. 264 Secret NOFORN Chapter 5 There was never another Agency U-2 mission from an aircraft carrier…
  • p. 290 …the OXCART aircraft for its own use, never adopted the laminated vertical stabilizers. $ ^{18} $ ## THE OXCART…
  • p. 294 …Scott employed concepts never before used in camera systems. These included the use of a reflecting…
  • p. 298 …above water. $ ^{29}$ As it turned out, the J58 was never used in a Navy aircraft.
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 303 …the J58 had to reach performance levels never before achieved by a jet engine, while operating…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and lockon modes, a fact that…
  • p. 317 …strongly opposed it and the 303 Committee never forwarded the proposal to President Johnson. $ ^{59} $ The…
  • p. 318 …The OXCART, which had never operated in heavy rain, taxied to the runway and took off…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …in 1962, its speed and altitude have never been equaled. The development of this aircraft also…
  • p. 348 …System-II, a communications and navigation system, never worked properly and was canceled. System-III, a…
  • p. 349 …a mission over the Soviet Union that never took place. Systems-XI through XV were ECM…
Secret NOFORN

storage capacity, and runway length were insufficient for the OXCART program, the site's remote location would greatly ease the task of maintaining the program's security, and a moderate construction program could provide adequate facilities. Construction began in September 1960; a C-47 shuttle service ferried work crews from Burbank to Las Vegas and from Las Vegas to the site.

The new 8,500-foot runway was completed by 15 November 1960. Kelly Johnson had been reluctant to have a standard Air Force runway with expansion joints every 25 feet because he feared the joints would set up undesirable vibrations in the speedy aircraft. At his suggestion a 150-foot wide runway was therefore constructed of six 25-foot-wide longitudinal sections, each 150 feet long but staggered. This layout put most of the expansion joints parallel to the direction of aircraft roll and reduced the frequency of the joints.

Additional improvements included the resurfacing of 18 miles of highway leading to the base so that heavy fuel trucks could bring in the necessary fuel. The need for additional buildings on the base was met by the Navy. Three surplus Navy hangars were dismantled, moved, and reassembled on the north side of the base, and more than 100 surplus Navy housing buildings were also transported to Area 51. All essential facilities were ready in time for the forecast delivery date of the first A-12 on 1 August 1961. $ ^{26} $

Unfortunately, this delivery date began to slip further and further into the future. Delays in obtaining the titanium, and later the J58 engines, caused the postponement of the final assembly of the first plane. Eventually, Kelly Johnson and Agency project officials decided to begin testing without waiting for the J58 engines by using Pratt & Whitney J75/19W engines, designed for the Convair F-106, to test the A-12 at altitudes up to 50,000 feet and at speeds up to Mach 1.6. Such a change, however, meant that the engine compartment of the first aircraft had to be reconfigured to accommodate the J75 engine. Lockheed hoped that this substitution would permit the delivery of the first A-12 by 22 December 1961 and its initial test flight by 27 February 1962.

Lockheed ran into so many technological problems with the OXCART effort that by October 1961 its costs had swollen to $136 million and were still climbing. Something obviously had to be done

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.