“Lockheed”60+ pages
- p. 4 …8
Lockheed CL-282 Supporters and the CIA... 13
Scientists and Overhead Reconnaissance... 17
The BEACON…
- p. 6 …260
Competition Between Lockheed and Convair... 267
The Selection of the Lockheed Design... 270
Efforts To…
- p. 12 …excellent technical study of the U-2: Lockheed U-2 (1983).
There has also been a…
- p. 22 …Immediately after returning to California, Carter proposed to Lockheed Vice President L. Eugene Root (previously the…
- p. 23 …competition for a high-altitude reconnaissance aircraft
Lockheed also submit a design. Carter noted that the…
- p. 24 …it to General Schriever, who then asked Lockheed to submit a specific proposal. In early April…
- p. 25 …Seaberg and his colleagues carefully evaluated the Lockheed submission and finally rejected it in early June…
- p. 26 …Despite the Air Force's selection of the X-16, Lockheed continued to work on the…
- p. 27 …Proposals for special reconnaissance aircraft have been received in the Air Staff from Lockheed, Fairchild, and…
- p. 28 …range are not as good as the Lockheed CL-282. $ ^{23} $
Gardner's enthusiasm for the…
- p. 29 …Few details about Dulles's precise attitude toward the proposed Lockheed reconnaissance aircraft are available, but…
- p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal still lacked official support…
- p. 37 …ISP chairman Baker then urged Donovan to travel to southern California to evaluate the Lockheed design…
- p. 39 …Thus, even though the Lockheed CL-282 had several important sources of support by September 1954…
- p. 40 …Council.46
## Project Three Support for the Lockheed CL-282
Even before the final Technological Capabilities…
- p. 42 …Agency. $ ^{49} $
Land learned the details of Lockheed's proposed CL-282 aircraft soon after he…
- p. 43 Secret NOFORN
Chapter 1
briefly mention a Lockheed design for a high-flying aircraft at the…
- p. 44 …During September and October the Project Three study group met frequently to discuss the Lockheed design…
- p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the reach of…
- p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials argued that the Bell X…
- p. 49 …He used Gardner's statement to convince Lockheed's senior management to approve the project, which…
- p. 50 …small group of prominent scientists that the Lockheed design represented the best possible overhead reconnaissance system…
- p. 53 …Eventually Bissell asked who was going to pay for the airframes to be built by Lockheed…
- p. 55 …This category included maintenance and support personnel from Lockheed (five per aircraft), the pilots, and support…
- p. 56 …to be settled, including the contract with Lockheed. Nevertheless, work on the U-2 began as…
- p. 57 …A general contractor such as Lockheed can purchase much, if not all, of the supplies needed…
- p. 58 …During the final contract negotiations in the spring of 1958, Lockheed and the US Government agreed…
- p. 63 …1954, even before the CIA adopted the Lockheed proposal. Baker quickly recognized, however, that he would…
- p. 69 …in a small Beechcraft plane piloted by Lockheed's chief test pilot, Tony LeVier. They spotted…
- p. 70 …By July 1955 the base was ready, and Agency, Air Force, and Lockheed personnel began moving…
- p. 74 project—the construction and testing of the aircraft—remained the exclusive province of Lockheed. $ ^{29} $
As…
- p. 77 …The first model of the pressure suit, used by Lockheed test pilots, made no provision for…
- p. 79 …Geary told Culbertson that the Lockheed CL-282 was going to be known officially as the…
- p. 81 …runway took the plane to 50 knots. Lockheed's chief test pilot, Tony LeVier, was at…
- p. 84 …article 341 before moving on to other Lockheed flight test programs in early September. This first…
- p. 85 …how to transfer Lockheed employees from Burbank to Area 51 without arousing a great deal of…
- p. 88 …Colonel Yancey was in charge of six SAC pilots who were to be trained by Lockheed…
- p. 90 …CIA, which then placed an order with Lockheed for 29 U-2s in configurations to be…
- p. 107 …U-2 cover story stating that a Lockheed-developed aircraft would be flown by the USAF…
- p. 143 …Lockheed mechanics had mounted the various RAINBOW devices on the prototype U-2, a Lockheed test…
- p. 144 …Unable to restart the power plant, Lockheed test pilot Robert Sieker bailed out but was struck…
- p. 145 …The loss of one of Lockheed's best test pilots, as well as the prototype "dirty…
- p. 157 …As a substitute, Lockheed began working to develop a paint with radar-suppressant qualities, but this…
- p. 162 …After a series of tests over Edwards AFB, Lockheed began coating the U-2s with a…
- p. 188 …Although it had been refurbished by Lockheed and now had the more powerful J75 engine that…
- p. 199 …In the meantime Powers began working for Lockheed as a U-2 pilot. In March 1963…
- p. 209 …Some poetic justice in this. $ ^{2} $
One week later Colonel Geary called to order Lockheed to…
- p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that they could be refueled in…
- p. 220 …story, which was that its pilots were Lockheed employees on a ferry flight to Puerto Rico…
- p. 230 …2Cs for Detachment C
Late in 1958, Lockheed began refitting the Agency's 13 remaining U…
- p. 235 …STPOLLY added the more advanced Lockheed P3A in 1963. Between 1955 and 1967, when the CIA…
- p. 236 …U-2 missions, and the Air Force, which had
Lockheed P-2V7 and P3A reconnaissance aircraft
- p. 238 …The planes were maintained by Lockheed mechanics under contract to the CIA. The Agency attempted to…
- p. 255 …All Air Force and CIA U-2s were ordered back to Lockheed for ultrasonic inspection of…
- p. 260 …The Agency dispatched several pilots to Taiwan under the cover of Lockheed employees working on a…
- p. 264 …G in California-with three more at Lockheed undergoing repair. The Agency had originally ordered 20…
- p. 265 …Francis Gary Powers was one of the Lockheed test pilots who checked out this new aircraft…
- p. 266 …began coming off the production line at Lockheed in-the autumn of 1968, CIA and the…
- p. 275 …Personnel at Lockheed's Skunk Works referred to these aircraft concepts as "Archangel-1," "Archangel-2…
- p. 276 Secret NOFORN
Chapter 6
Lockheed design for a hydrogen-powered aircraft (the CL-400). The committee…
Read from the scan by GLM-OCR; expect the odd misread word.
## CHOOSING PILOTS FOR OXCART
Just as in the U-2 program, the Air Force provided considerable support to Project OXCART, including training, fuel storage, and weather service. One of the most important areas of support was the provision of pilots; all of the OXCART pilots came from the Air Force. Prospective pilots had to be qualified in the most advanced fighters and be emotionally stable and well motivated. In contrast to 1955, when cover considerations had limited the U-2 pilot selection process to individuals with reserve commissions, the Air Force was able to devise personnel and cover procedures that enabled both regular and reserve officers to volunteer to become OXCART pilots. Because of the limited size of the A-12 cockpit, they had to be under six feet tall and weigh less than 175 pounds. Following extensive physical and psychological screening, 16 potential nominees were selected for intensive security and medical screening by the Agency. By the end of this screening in November 1961, only five individuals had been approved and had accepted the Agency's offer of employment on a highly classified project involving a very advanced aircraft. A second search and screening raised the number of pilots for the OXCART to eleven. The thorough screening process produced an elite group of pilots; all but one of these 11 officers eventually became generals. The new pilots transferred from military to civilian status and received compensation and insurance arrangements somewhat better than those of the U-2 pilots. $ ^{25} $
From the very beginning, it was clear that Lockheed could not test the OXCART aircraft at its Burbank facility, where the runway was too short and too exposed to the public. The ideal testing site would be far removed from metropolitan areas, away from civil and military airways, easily accessible by air, blessed with good weather, capable of accommodating large numbers of personnel, near an Air Force installation, and having a runway at least 8,000 feet long. But no such place was to be found.
## SELECTION OF A TESTING SITE FOR THE OXCART
After considering 10 Air Force bases programmed for closing, Richard Bissell decided to upgrade the Area 51 site in Nevada where the U-2 had been tested. Although its personnel accommodations, fuel