Documents / FOIA release

The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974

Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR

This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 13 …Without their help a good deal of this story could never have become known. The assistance…
  • p. 44 …the CL-282; in fact, there may never have been a formal decision as such. In…
  • p. 74 …fly, Lockheed engineers had to solve problems never before encountered. Among these problems was the need…
  • p. 84 …Flight tests continued, with the U-2 ascending to altitudes never before attained in sustained flight…
  • p. 102 …put aside for further thought (which it never received), and Bissell's weather research cover remained…
  • p. 138 …William Shelton, raised an important question that had never been considered: what would happen if an…
  • p. 147 …Peninsula, because of bad weather and, therefore, never entered Soviet airspace. A second attempt to photograph…
  • p. 157 …2 flight over the Black Sea that never violated Soviet airspace revealed 12 attempts at interception…
  • p. 159 …Six of the men on board were killed and the remaining 11 were never heard from…
  • p. 160 …Although this new Berlin crisis never became as threatening as the blockade of 1948-49, President…
  • p. 165 …The Air Force never equipped its original U-2s with the J75 engines. $ ^{106} $ Detachment C…
  • p. 189 …Powers never made it past Sverdlovsk. Four and a half hours into the mission, an SA…
  • p. 194 …2 program in 1974, but RAF pilots never again conducted an overflight in an Agency U…
  • p. 208 …very good reason, and such a situation never developed, in part because satellite photography gradually began…
  • p. 210 …Since this never happened, Francis Gary Powers' flight on 1 May 1960 proved to be the…
  • p. 223 …Responsibility for photographic coverage of Cuba remained with the Air Force; Agency pilots never flew another…
  • p. 227 …Both were experienced with World War II aircraft, although Vito had never flown the rebels' fighter…
  • p. 248 …It was short of both pilots and planes and never had more than three U-2s…
  • p. 257 …This was an electronic intelligence mission that, in accordance with the new guidelines, never came closer…
  • p. 264 Secret NOFORN Chapter 5 There was never another Agency U-2 mission from an aircraft carrier…
  • p. 290 …the OXCART aircraft for its own use, never adopted the laminated vertical stabilizers. $ ^{18} $ ## THE OXCART…
  • p. 294 …Scott employed concepts never before used in camera systems. These included the use of a reflecting…
  • p. 298 …above water. $ ^{29}$ As it turned out, the J58 was never used in a Navy aircraft.
  • p. 299 …This new delay was caused by leaking fuel tanks, a problem that would never be solved…
  • p. 303 …the J58 had to reach performance levels never before achieved by a jet engine, while operating…
  • p. 313 …even though the SKYLARK contingency plan was never put into effect. Since U-2s continued to…
  • p. 316 …Moreover, the Soviets never operated the radars in the tracking and lockon modes, a fact that…
  • p. 317 …strongly opposed it and the 303 Committee never forwarded the proposal to President Johnson. $ ^{59} $ The…
  • p. 318 …The OXCART, which had never operated in heavy rain, taxied to the runway and took off…
  • p. 326 …collector of strategic intelligence, the OXCART was never used for this purpose. Its brief deployment was…
  • p. 328 …Yet, the President never went so far as to eliminate the overflight program. As Commander in…
  • p. 333 …in 1962, its speed and altitude have never been equaled. The development of this aircraft also…
  • p. 348 …System-II, a communications and navigation system, never worked properly and was canceled. System-III, a…
  • p. 349 …a mission over the Soviet Union that never took place. Systems-XI through XV were ECM…
Secret NOFORN
Chapter 6
278

to achieve the desired target altitude of 91,000 feet. Afterward, he noted in the project log: "We have no performance margins left; so this project, instead of being 10 times as hard as anything we have done, is 12 times as hard. This matches the design number and is obviously right." $ ^{19} $

These changes satisfied Bissell, who notified Johnson on 26 January that the CIA was authorizing the construction of 12 of the new aircraft. The actual contract was signed on 11 February 1960. Lockheed's original quotation for the project was $96.6 million for 12 aircraft, but technological difficulties eventually made this price impossible to meet. Recognizing that fabricating an aircraft from titanium might involve unforeseen difficulties, the CIA included a clause in the contract that allowed costs to be reevaluated. During the next five years, this clause had to be invoked on a number of occasions as the A-12's costs soared to more than double the original estimate. $ ^{20} $

## NEW TECHNOLOGIES NECESSITATED BY OXCART'S HIGH SPEED

According to the specifications, the OXCART aircraft was to achieve a speed of Mach 3.2 (2,064 knots or 0.57 miles per second, which would make it as fast as a rifle bullet), have a range of 4,120 nautical miles, and reach altitudes of 84,500 to 97,600 feet. The new aircraft would thus be more than five times as fast as the U-2 and would go almost 3 miles higher.

One major disadvantage of the OXCART's great speed was high temperatures. Flying through the earth's atmosphere at Mach 3.2 heated portions of the aircraft's skin to almost $ 9 0 0 ^{\circ} \mathrm{F} $ . An aircraft operating at these high speeds and high temperatures required fuels, lubricants, and hydraulic fluids that had not yet been invented. The OXCART's fuel requirement called for a low-vapor-pressure fuel with a low volume at operating temperatures; the fuel would also be used as a heat sink to cool various parts of the aircraft. The J58 engines required lubricants that did not break down at the very high operating temperatures of Mach 3.2 speeds. This requirement led to the

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.