Documents / FOIA release
The Central Intelligence Agency and Overhead Reconnaissance; the U-2 and Oxcart Programs, 1954-1974
Central Intelligence Agency · 1900-01-01 · 406 pages · text by OCR
This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.
“Headquarters”25 pages
- p. 22 …Air Force headquarters soon approved Martin's proposal to modify the B-57 and was very…
- p. 31 …Their headquarters was located over a secretarial school on Beacon Hill, which soon became the codename…
- p. 55 Secret NOFORN
Chapter 2
42
The Matomic Building
total of 357 personnel divided among project headquarters…
- p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
- p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
- p. 85 …Frequent flights were also necessary to bring in supplies and visitors from contractors and headquarters. Therefore…
- p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
- p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
- p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
- p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
- p. 128 …Lundahl and Reber flew from the United Kingdom to US Air Force Europe headquarters in Wiesbaden…
- p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
- p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
- p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
- p. 191 …commander at Adana, to Air Force Europe headquarters, to replace the cover story that had been…
- p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
- p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
- p. 233 …On 6 June 1960, project headquarters decided on a phased-out withdrawal of Detachment C between…
- p. 235 …Airport, the pilot reported the incident to Headquarters. The Office of Security immediately contacted the Pennsylvania…
- p. 312 …Project headquarters therefore began preparing contingency plans (Project SKYLARK) for the possible employment of OXCART over…
- p. 319 …To ensure secure communications between Headquarters and Kadena.
A typical mission over North Vietnam required refueling…
- p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A-12s would…
- p. 324 …President Johnson confirmed this decision on 21 May. $ ^{69} $
Project headquarters selected 8 June 1968 as…
- p. 334 …Air Force personnel served at all levels of the reconnaissance program, from project headquarters to the…
- p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword).
Interview with…
characteristics, although the Lockheed design's specifications were slightly better in each category. The Lockheed design was also preferable in terms of overall cost. In the vital area of vulnerability to radar detection, however, the Convair design was superior. Its smaller size and internally mounted engines gave it a smaller radar cross section than the Lockheed A-12. $ ^{15} $
Secret NOFORN
Chapter 6
Lockheed A-12 Convair KINGFISH
Speed Mach 3.2 Mach 3.2
Range(total) 4120nm 3400nm
Range(at altitude) 3800nm 3400nm
Cruising Altitude
Start 84500ft. 85000ft.
Midrange 91000ft. 88000ft.
End 97600ft. 94000ft.
Cost summary(for12 aircraft without engines) $96.6 million $121.6 million
Some of the CIA representatives initially favored the Convair KINGFISH design because of its smaller radar cross section, but they were eventually convinced to support the Lockheed design by the Air Force members of the panel, who believed that Convair's cost overruns and production delays on the B-58 project might be repeated in this new project. In contrast, Lockheed had produced the U-2 under budget and on time. Another factor favoring the A-12 was security. Lockheed had experience in running a highly secure facility (the Skunk Works) in which all of the key employees were already cleared by the Agency.
Despite its vote in favor of the Lockheed proposal, the selection panel remained concerned about the A-12's vulnerability to radar detection and therefore required Lockheed to prove its concept for reducing the A-12's radar cross section by 1 January 1960. On 14 September 1959, the CIA awarded a four-month contract to Lockheed Not linked to a story yet.
About this file
FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.