This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 22 …Air Force headquarters soon approved Martin's proposal to modify the B-57 and was very…
  • p. 31 …Their headquarters was located over a secretarial school on Beacon Hill, which soon became the codename…
  • p. 55 Secret NOFORN Chapter 2 42 The Matomic Building total of 357 personnel divided among project headquarters…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 85 …Frequent flights were also necessary to bring in supplies and visitors from contractors and headquarters. Therefore…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 128 …Lundahl and Reber flew from the United Kingdom to US Air Force Europe headquarters in Wiesbaden…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 191 …commander at Adana, to Air Force Europe headquarters, to replace the cover story that had been…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 233 …On 6 June 1960, project headquarters decided on a phased-out withdrawal of Detachment C between…
  • p. 235 …Airport, the pilot reported the incident to Headquarters. The Office of Security immediately contacted the Pennsylvania…
  • p. 312 …Project headquarters therefore began preparing contingency plans (Project SKYLARK) for the possible employment of OXCART over…
  • p. 319 …To ensure secure communications between Headquarters and Kadena. A typical mission over North Vietnam required refueling…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A-12s would…
  • p. 324 …President Johnson confirmed this decision on 21 May. $ ^{69} $ Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the reconnaissance program, from project headquarters to the…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
# The U-2's Intended Successor: Project OXCART, 1956-1968

Before the U-2 became operational in June 1956, CIA project officials had estimated that its life expectancy for flying safely over the Soviet Union would be between 18 months and two years. After overflights began and the Soviets demonstrated the capability of tracking and attempting to intercept the U-2, this estimate seemed too optimistic. By August 1956, Richard Bissell was so concerned about the U-2's vulnerability that he despaired of its ability to avoid destruction for six months, let alone two years.

To extend the U-2's useful operational life, project officials first attempted to reduce the aircraft's vulnerability to detection by Soviet radars. Project RAINBOW's efforts to mask the radar image of the U-2 not only proved ineffective, but actually made the aircraft more vulnerable by adding extra weight that reduced its maximum altitude. Because Soviet radar operators continued to find and track U-2s equipped with antiradar systems, the CIA canceled Project RAINBOW in May 1958.

Long before the failure of Project RAINBOW, Richard Bissell and his Air Force assistant, Col. Jack A. Gibbs, had begun to look for a more radical solution to the problem of Soviet radar detection—an entirely new aircraft. In the late summer of 1956, the two officials visited a number of airframe contractors in a search for new ideas. Among the more unusual was Northrop Aviation's proposal for a gigantic aircraft with a very-high-lift wing. Because it would not be made of metal, the wing would require a type of bridge truss on its upper side to give it rigidity. The proposed aircraft would achieve