This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 22 …Air Force headquarters soon approved Martin's proposal to modify the B-57 and was very…
  • p. 31 …Their headquarters was located over a secretarial school on Beacon Hill, which soon became the codename…
  • p. 55 Secret NOFORN Chapter 2 42 The Matomic Building total of 357 personnel divided among project headquarters…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 85 …Frequent flights were also necessary to bring in supplies and visitors from contractors and headquarters. Therefore…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 128 …Lundahl and Reber flew from the United Kingdom to US Air Force Europe headquarters in Wiesbaden…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 191 …commander at Adana, to Air Force Europe headquarters, to replace the cover story that had been…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 233 …On 6 June 1960, project headquarters decided on a phased-out withdrawal of Detachment C between…
  • p. 235 …Airport, the pilot reported the incident to Headquarters. The Office of Security immediately contacted the Pennsylvania…
  • p. 312 …Project headquarters therefore began preparing contingency plans (Project SKYLARK) for the possible employment of OXCART over…
  • p. 319 …To ensure secure communications between Headquarters and Kadena. A typical mission over North Vietnam required refueling…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A-12s would…
  • p. 324 …President Johnson confirmed this decision on 21 May. $ ^{69} $ Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the reconnaissance program, from project headquarters to the…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…
## Secret NOFORN

Chapter 5

252

U-2C and U-2R

The U-2R used the upgraded Pratt & Whitney J75/P-13B engine and was able to fly higher—in excess of 74,000 feet—and faster Mach 0.72 (410 knots), which is 12 knots faster than the U-2C. When flying at the higher altitude, however, the U-2R's range was less than the U-2C's. The restart capability of the P-13B engine was significantly better than the P-13A power plant. As a result, the U-2R could be restarted at 54,000 feet, which was 10,000 feet higher than the U-2C. Francis Gary Powers was one of the Lockheed test pilots who checked out this new aircraft when it first took to the air on 28 August 1967. The last of the U-2Rs was delivered on 11 December 1968.

The increased performance of the U-2R did not come cheaply. At $7.1 million per aircraft, the new models cost almost 10 times as much as the original U-2s. Much of the increased cost was due to inflation, but some was the result of technological advances. The initial order for eight of the new version of the U-2 was followed on 23 November 1966 by an order from the DCI and the Secretary of Defense for four more. This brought the total number of U-2Rs purchased by the CIA and the Air Force to 12. $ ^{72} $

In addition to a new aircraft, the U-2 program received a new camera. Agency managers felt that, because the B camera was now 10 years old, the U-2R needed a camera that incorporated the many important advances that had occurred in recent years. The 112B—the modified version of the satellite program's stereo camera that had been used in the U-2G—had not proved totally successful. Despite its stereo capability, this camera's shorter focal length could not provide

Not linked to a story yet.

About this file

FOIA release, from the cia-readingroom collection. The PDF is mirrored here; the original link is under it. The text was read from the page images by an OCR model; expect the odd misread word. 406 pages are in the text index: search them above, or from the library's search.