“Lockheed”60+ pages
- p. 4 …8
Lockheed CL-282 Supporters and the CIA... 13
Scientists and Overhead Reconnaissance... 17
The BEACON…
- p. 6 …260
Competition Between Lockheed and Convair... 267
The Selection of the Lockheed Design... 270
Efforts To…
- p. 12 …excellent technical study of the U-2: Lockheed U-2 (1983).
There has also been a…
- p. 22 …Immediately after returning to California, Carter proposed to Lockheed Vice President L. Eugene Root (previously the…
- p. 23 …competition for a high-altitude reconnaissance aircraft
Lockheed also submit a design. Carter noted that the…
- p. 24 …it to General Schriever, who then asked Lockheed to submit a specific proposal. In early April…
- p. 25 …Seaberg and his colleagues carefully evaluated the Lockheed submission and finally rejected it in early June…
- p. 26 …Despite the Air Force's selection of the X-16, Lockheed continued to work on the…
- p. 27 …Proposals for special reconnaissance aircraft have been received in the Air Staff from Lockheed, Fairchild, and…
- p. 28 …range are not as good as the Lockheed CL-282. $ ^{23} $
Gardner's enthusiasm for the…
- p. 29 …Few details about Dulles's precise attitude toward the proposed Lockheed reconnaissance aircraft are available, but…
- p. 30 …At this point, the summer of 1954, Lockheed's CL-282 proposal still lacked official support…
- p. 37 …ISP chairman Baker then urged Donovan to travel to southern California to evaluate the Lockheed design…
- p. 39 …Thus, even though the Lockheed CL-282 had several important sources of support by September 1954…
- p. 40 …Council.46
## Project Three Support for the Lockheed CL-282
Even before the final Technological Capabilities…
- p. 42 …Agency. $ ^{49} $
Land learned the details of Lockheed's proposed CL-282 aircraft soon after he…
- p. 43 Secret NOFORN
Chapter 1
briefly mention a Lockheed design for a high-flying aircraft at the…
- p. 44 …During September and October the Project Three study group met frequently to discuss the Lockheed design…
- p. 47 …The Lockheed super glider will fly at 70,000 feet, well out of the reach of…
- p. 48 …Putt, to oppose the adoption of the Lockheed design. The officials argued that the Bell X…
- p. 49 …He used Gardner's statement to convince Lockheed's senior management to approve the project, which…
- p. 50 …small group of prominent scientists that the Lockheed design represented the best possible overhead reconnaissance system…
- p. 53 …Eventually Bissell asked who was going to pay for the airframes to be built by Lockheed…
- p. 55 …This category included maintenance and support personnel from Lockheed (five per aircraft), the pilots, and support…
- p. 56 …to be settled, including the contract with Lockheed. Nevertheless, work on the U-2 began as…
- p. 57 …A general contractor such as Lockheed can purchase much, if not all, of the supplies needed…
- p. 58 …During the final contract negotiations in the spring of 1958, Lockheed and the US Government agreed…
- p. 63 …1954, even before the CIA adopted the Lockheed proposal. Baker quickly recognized, however, that he would…
- p. 69 …in a small Beechcraft plane piloted by Lockheed's chief test pilot, Tony LeVier. They spotted…
- p. 70 …By July 1955 the base was ready, and Agency, Air Force, and Lockheed personnel began moving…
- p. 74 project—the construction and testing of the aircraft—remained the exclusive province of Lockheed. $ ^{29} $
As…
- p. 77 …The first model of the pressure suit, used by Lockheed test pilots, made no provision for…
- p. 79 …Geary told Culbertson that the Lockheed CL-282 was going to be known officially as the…
- p. 81 …runway took the plane to 50 knots. Lockheed's chief test pilot, Tony LeVier, was at…
- p. 84 …article 341 before moving on to other Lockheed flight test programs in early September. This first…
- p. 85 …how to transfer Lockheed employees from Burbank to Area 51 without arousing a great deal of…
- p. 88 …Colonel Yancey was in charge of six SAC pilots who were to be trained by Lockheed…
- p. 90 …CIA, which then placed an order with Lockheed for 29 U-2s in configurations to be…
- p. 107 …U-2 cover story stating that a Lockheed-developed aircraft would be flown by the USAF…
- p. 143 …Lockheed mechanics had mounted the various RAINBOW devices on the prototype U-2, a Lockheed test…
- p. 144 …Unable to restart the power plant, Lockheed test pilot Robert Sieker bailed out but was struck…
- p. 145 …The loss of one of Lockheed's best test pilots, as well as the prototype "dirty…
- p. 157 …As a substitute, Lockheed began working to develop a paint with radar-suppressant qualities, but this…
- p. 162 …After a series of tests over Edwards AFB, Lockheed began coating the U-2s with a…
- p. 188 …Although it had been refurbished by Lockheed and now had the more powerful J75 engine that…
- p. 199 …In the meantime Powers began working for Lockheed as a U-2 pilot. In March 1963…
- p. 209 …Some poetic justice in this. $ ^{2} $
One week later Colonel Geary called to order Lockheed to…
- p. 211 …In May 1961, Lockheed began modifying Agency U-2s so that they could be refueled in…
- p. 220 …story, which was that its pilots were Lockheed employees on a ferry flight to Puerto Rico…
- p. 230 …2Cs for Detachment C
Late in 1958, Lockheed began refitting the Agency's 13 remaining U…
- p. 235 …STPOLLY added the more advanced Lockheed P3A in 1963. Between 1955 and 1967, when the CIA…
- p. 236 …U-2 missions, and the Air Force, which had
Lockheed P-2V7 and P3A reconnaissance aircraft
- p. 238 …The planes were maintained by Lockheed mechanics under contract to the CIA. The Agency attempted to…
- p. 255 …All Air Force and CIA U-2s were ordered back to Lockheed for ultrasonic inspection of…
- p. 260 …The Agency dispatched several pilots to Taiwan under the cover of Lockheed employees working on a…
- p. 264 …G in California-with three more at Lockheed undergoing repair. The Agency had originally ordered 20…
- p. 265 …Francis Gary Powers was one of the Lockheed test pilots who checked out this new aircraft…
- p. 266 …began coming off the production line at Lockheed in-the autumn of 1968, CIA and the…
- p. 275 …Personnel at Lockheed's Skunk Works referred to these aircraft concepts as "Archangel-1," "Archangel-2…
- p. 276 Secret NOFORN
Chapter 6
Lockheed design for a hydrogen-powered aircraft (the CL-400). The committee…
Read from the scan by GLM-OCR; expect the odd misread word.
week later the Viet Cong and North Vietnamese launched their Tet offensive in South Vietnam. The 303 Committee (the new name for the Special Group after 1964) decided on 1 February 1968 to suspend a group of overflights scheduled for February and called for mission-by-mission approval "during this period of tension." The committee approved one additional overflight of southern China, which was flown by Detachment H on 16 March 1968, and two overflights of Cambodia, carried out on 27 March and 3 April 1968 by Detachment G in its first operations since early 1966. These three missions turned out to be the last overflights by U-2s in the Far East. By this time U-2 flights over the PRC had become so dangerous that the State Department opposed further overflights, and on 10 April 1968 the 303 Committee decided not to approve any mission that would fly closer than 20 miles from the coast of China.
Secret NOFORN
Chapter 5
243
One reason why Detachment H's overflights were stopped was the steady increase in the PRC's ability to track and engage U-2s, as evidenced by its success in downing five U-2s. By 1968 PRC radars along the coast opposite Taiwan were keeping a close watch on U-2 activity from the T'ao-yuan base and actively tracked U-2s as soon as they became airborne. The U-2s then had to face a growing PRC air defense system that not only consisted of SA-2 missiles but also the fast and high-flying MiG-21. The PRC's MiG-21 pilots had become adept at the power-zoom technique and were threatening almost every U-2 mission. The risks to U-2s now seemed too great. $ ^{65} $
The decision to end Asian overflights was also rooted in the Johnson administration's change in its whole approach to the war in Indochina in the spring of 1968. On 31 March 1968, the President limited the bombing of North Vietnam in order to improve the chances for peace talks. The end of flights over the People's Republic of China was viewed as another way to improve the peace process.
During its six years of overflight operations, Project TACKLE had been extremely active, staging a total of 104 flights over the People's Republic of China (see table, page 244). These missions had brought back huge amounts of data about the PRC but not without a price: five Project TACKLE aircraft had been downed by the PRC, with two of the pilots killed and the other three captured (although later returned). In addition, five other Nationalist Chinese pilots had been killed in training accidents.