This is a 1992 CIA History Staff monograph by Gregory W. Pedlow and Donald E. Welzenbach, originally classified Secret NOFORN and approved for release in 2013. It covers the CIA's manned overhead reconnaissance program from 1954 to 1974 and the two aircraft it developed, the U-2 and the A-12 OXCART. The history covers the U-2 overflights of the Soviet Union, the 1960 downing of Francis Gary Powers and later operations in Asia and Latin America. It also includes a section on U-2s, UFOs and Operation BLUE BOOK.

  • p. 22 …Air Force headquarters soon approved Martin's proposal to modify the B-57 and was very…
  • p. 31 …Their headquarters was located over a secretarial school on Beacon Hill, which soon became the codename…
  • p. 55 Secret NOFORN Chapter 2 42 The Matomic Building total of 357 personnel divided among project headquarters…
  • p. 56 …until it moved into the new CIA Headquarters building at Langley in March 1962. The final…
  • p. 73 …On 3 August 1955, Dulles and Twining met at SAC headquarters in Omaha to sign the…
  • p. 85 …Frequent flights were also necessary to bring in supplies and visitors from contractors and headquarters. Therefore…
  • p. 102 …U-2 project officer, the Air Force Headquarters project officer, and NACA's top official, Dr…
  • p. 107 …did not have to report to higher headquarters. WRSP-1, known within the Agency as Detachment…
  • p. 117 …Late on the evening of 3 July, Bissell went to project headquarters in the Matomic Building…
  • p. 127 …The PARAMOUNT Committee worked inside PID headquarters in the Steuart Building. Composed of members from CIA…
  • p. 128 …Lundahl and Reber flew from the United Kingdom to US Air Force Europe headquarters in Wiesbaden…
  • p. 138 …later and promptly reported the conversation to headquarters. When details of Vito's close call reached…
  • p. 153 …of Detachment A achieved excellent results, project headquarters had already decided that Western Europe was not…
  • p. 168 …The British missions would be operationally controlled by CIA project headquarters. Soon afterward four British pilots…
  • p. 191 …commander at Adana, to Air Force Europe headquarters, to replace the cover story that had been…
  • p. 194 …Because the new government had not been briefed on the U-2, Project Headquarters refused to…
  • p. 205 …its own building to the new CIA Headquarters at Langley. Soon afterward, Col. Stanley W. Beerli…
  • p. 233 …On 6 June 1960, project headquarters decided on a phased-out withdrawal of Detachment C between…
  • p. 235 …Airport, the pilot reported the incident to Headquarters. The Office of Security immediately contacted the Pennsylvania…
  • p. 312 …Project headquarters therefore began preparing contingency plans (Project SKYLARK) for the possible employment of OXCART over…
  • p. 319 …To ensure secure communications between Headquarters and Kadena. A typical mission over North Vietnam required refueling…
  • p. 323 …Project headquarters informed Deputy Defense Secretary Vance on 10 January 1967 that the A-12s would…
  • p. 324 …President Johnson confirmed this decision on 21 May. $ ^{69} $ Project headquarters selected 8 June 1968 as…
  • p. 334 …Air Force personnel served at all levels of the reconnaissance program, from project headquarters to the…
  • p. 365 …Speech given by Richard Bissell at CIA Headquarters, 12 October 1965 (Top Secret Codeword). Interview with…

Read from the scan by GLM-OCR; expect the odd misread word.

overflights of Cuban territory. He argued that the loss of an aircraft on a mission that combined both types of flights would make it difficult for the United States to stand on its rights to fly over international waters. Bundy and Carter therefore agreed to split the proposed reconnaissance program into four missions: two overflights and two peripheral flights, all planned for maximum safety. The overflights were thus designed to be quick "in-and-out" operations across the narrow width of the island instead of flights along the entire length of Cuba, as had been the case previously. (As the map on page 202 illustrates, the 5 September mission was the last one to fly along the length of the island.) As an additional precaution, flightpaths would be laid out to avoid known SAM sites. Although these changes greatly reduced the danger to the U-2, they slowed the gathering of information on the Soviet buildup by reducing each mission's coverage.9

To ensure that the photographs taken by these missions were of the highest quality, the CIA decided to conduct flights only when the weather along the flight routes was less than 25 percent overcast. Weather proved to be a major problem during the month of September. Unfavorable forecasts (along with a brief standdown of U-2 overflights after the loss of the Nationalist Chinese U-2) prevented the launching of any missions from 6 through 16 September. Moreover, when mission 3091 finally flew on 17 September, the favorable weather forecast proved inaccurate and heavy clouds prevented the mission from obtaining usable photography. Bad weather continued to rule out missions until 26 September, when mission 3093 covered eastern Cuba and found three additional SAM sites. Three days later mission 3095 flew over the Isle of Pines and Bay of Pigs area, finding one more SAM site and a coastal-defense cruise missile site. $ ^{10} $

The cautious series of U-2 flights in September had turned up many more SAM sites but no concrete evidence of the presence of surface-to-surface missiles. Growing impatient with the restrictions

Not linked to a story yet.