Documents / Document
This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.
Read from the scan by GLM-OCR; expect the odd misread word.
## CONFIDENTIAL ALDRIN Well, it's something you can't afford to get ahead of yourself and be moving around too fast. If there's any question at all and I think we all played it very cautiously until each of us in our own particular way realized that it was just no problem. As we adapted to it, we could go about any kind of movement that we wanted without any particular concern. But the stakes are pretty high and you can't afford to let these things get the best of you. 4.5 OPTICS COVER JETTISON (DEBRIS) COLLINS I heard a little noise, but I saw no debris and I could not verify that they had jettisoned. I looked through both instruments and I couldn't see that they had jettisoned. 4.6 SCS ATTITUDE REFERENCE COMPARISON COLLINS Okay. ARMSTRONG It went well. No problems. 4.7 SM AND CM RCS ARMSTRONG We did hot RCS checks on the service module RCS prior to TLI. The intent here was to assure ourselves that we did, in fact, have an operable control system and that our hand controllers could, in fact, talk to something before committing ourselves to a lunar trajectory. We did that in ## CONFIDENTIAL
Document, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 251 pages are in the text index: search them above, or from the library's search.