Documents / Document
This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.
“Harder”2 pages
Read from the scan by GLM-OCR; expect the odd misread word.
## CONFIDENTIAL confidence was right in the area of the SRC. We can identify its location pretty well by the photograph. The solar wind disengaged from its staff quite easily. When it rolled up, it had a tendency to sneak off to the side and crinkle on the edges. I spent some 20 to 30 seconds unrolling it and trying to get it to go up a little smoother. I then remembered that they really didn't care about exact neatness. All they wanted was the material back because they were going to cut it up in many pieces anyway. So I bunched it together and it slid into its container fairly easily. ## ALDRIN In regard to the SRC height, we couldn't tell, due to the insulation, just what it was; but we gave the height of our ladder above the ground. The photographs would fill in the story there. It might be advisable to have some simple measuring device. It wouldn't take very much. Perhaps by the use of some marks you just make a judgment whether the distance between the 3 and the 4 is the same as between the 4 and the 5 or whatever the sequence might be. ## CONFIDENTIAL
Document, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 251 pages are in the text index: search them above, or from the library's search.