Documents / Document

Apollo 11 Technical Crew Debriefing, Volume 1 (scan)

NASA via ibiblio · 1969-07-31 · 251 pages · text by GLM-OCR

This is Volume 1 of NASA's Apollo 11 Technical Crew Debriefing, dated July 31, 1969. The Mission Operations Branch of the Flight Crew Support Division at the Manned Spacecraft Center in Houston prepared it, and it was originally classified Confidential. In it Armstrong, Aldrin and Collins go phase by phase through suiting, launch, powered flight, Earth orbit and lunar surface activities. They comment on suit fit, vibration, checklists, lunar dust, footing and poor sleeping conditions in the lunar module. A section titled Visual Sightings appears in the table of contents.

Read from the scan by GLM-OCR; expect the odd misread word.

## CONFIDENTIAL

COLLINS (CONT'D)	tell. All of a sudden, this thing changed character from a static to a dynamic situation, and that was what I woul call the instant of lift-off.
ARMSTRONG	Concerning the noise/vibration intensity at lift-off, it was my impression that the combination was rather severe until approximately the time of "Tower clear," at which time there was a significant decrease.
COLLINS	Yes, but would you say noise? I would say vibrations. I thought the noise level was much less than I had expected. The vibration was more.
ALDRIN	How about a rumbling? That is physically felt as much as heard.
COLLINS	You don't hear it in your ears. You feel it in your whole body. Whether that's noise or whether that's vibration, I don't know.
ARMSTRONG	I would agree that the noise was low level.
COLLINS	In terms of interference with communications, though, I think you would also have to say that it is low level.
ARMSTRONG	That's true.

## CONFIDENTIAL

About this file

Document, cited by the archive. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 251 pages are in the text index: search them above, or from the library's search.